My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
2300 - Underground Storage Tank Program
>
PR0231216
>
COMPLIANCE INFO_2003-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:32:22 PM
Creation date
6/3/2020 9:46:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2008
RECORD_ID
PR0231216
PE
2361
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
01
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231216_4511 PACIFIC_2003-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K9 <br /> 0 f <br /> AMA <br /> � . <br /> r <br /> t 'QUALITY TESTING OF UNDERGROUND TANKSATAFFORDABLERATES' <br /> 416 2nd Street Galt, CA 95632 (209) 744-0112 FAX 744-0116 <br /> • i <br /> ' General Information <br /> Facility Name: c sWlale,771, Lq Bldg.No.: <br /> Site Address: `41 OW do <br /> Of 0 > ® City: �t, Zip: <br /> Facility Contact Person: Contact Phone No.: -, `/ j <br /> Make/Model of Monitoring System: "` 75 ZOP I Date of Testing/Servicing: / / <br /> B. Inventory of Equipment Tested/Certified <br /> Check the a2progirinte boxes to indicate mecific equipment Inspected/serviced: <br /> Tanis im Tank ID: <br /> ❑ In-T• k Gauging Probe. Model: �� ❑ In-Tank Gauging Probe. Model: _ <br /> UCn�ular Space or Vault Sensor. Mo Cd Annular Space or Vault Sensor. Model:_ S <br /> W-fi-ping Sump/Trench Sensor(s). Model: 1`� tt, / ping Sump/Trench Sensor(s). Model: r:<',(!2 <br /> ❑ Fill Sump Sensor(s). Model: ❑ Fill Sump Sensor(s). Model• <br /> ❑ Mechanical Line Leak Detector. Model: ❑ Mechanical Line Leak Detector. Model: <br /> ❑ Electronic Line Leak Detector. Model: ❑ Electronic Line Leak Detector. Model: <br /> ❑ Tank Overfill/High-Level Sensor. Model: ❑ Tank Overfill/High-Level Sensor. Model: <br /> ❑ Other(specify ui Ment Me and model in Section E on Pae 2). ❑ Other( ' e ui Ment a and model in Section E on Pae 2). <br /> Tank ID: Tank 11): <br /> ❑ In-Tank Gauging Probe. Model: ❑In-Tank Gouging Probe, Model: <br /> ❑ Annular Space or Vault Sensor. Model: ❑ Annular Space or Vault Sensor. Model: <br /> ❑ Piping Sump/Trench Seasor(s). Model: ❑ Piping Sump/Trench Sensor(s). Model: <br /> ❑ Fill Sump Sensor(s). Model: ❑ Fm11 Sump Sensor(s). Model: <br /> ❑ Mechanical Line Leak Detector. Model: ❑ Mechanical Line Leak Detector. Model: <br /> ❑ Electronic Lane Leak Detector. Model: Cl Electronic Line Leak Detector. Model: <br /> ❑ Tank Overfill/High-Level Sensor. Model: ❑ Tank Overfill/High-Level Sensor. Model: <br /> ❑ Other(spSEffj EquipMent a and model in Section E on P e 2). (3 Other( eci !i Ment a and model in Section E on Pae 2). <br /> Dispenser ID: Dispenser ID: j <br /> ❑ Dispenser Containment Sensor(s). Model: 42 14 '4 : ❑ Dispenser Containment Sensor(s). Model: <br /> ❑ Shear Valve(s). ❑ Shear Valve(s). <br /> ❑ Dis enser Containment Float(s)and Chain(s). ❑ Di nser Containment Floats)and Chain(s). <br /> Dispenser ID: Dispenser ID: <br /> ❑ Dispenser Containment ensor(s). Model: P-C 2 ❑ Dispenser Containment Sensor(s). Model: <br /> ❑ Shear Valve(s). ❑ Shear Valve(s). <br /> ❑ Dispenser Containment Float(s)and Chain(s). ❑ Dispenser Containment Floats)and Chain(s). <br /> Dispenser ID: Dispenser ID: <br /> ❑ Dispenser Containment Sensor(s). Model ❑ Dispenser Containment Sensor(s). Model: <br /> ❑ Shear Valve(s). ❑ Shear Valve(s). <br /> ❑Dis enser Containment Float(s)and Chain(s). ❑ Dispenser Containment Float(s)and Chain(s). <br /> *If the facility contains more tanks or dispensers,copy this form. Include information for every tank and dispenser at the facility. <br /> C. Certification-I certify that the equipment identified in this document wasinspected/serviced in accordance with the manufacturers' <br /> guidelines. Attached to this'pertification is information (e g, manufacturers° checklists) necessary to verify that this information is <br /> -correct and a Plot Plan showing the HayouE of inanitoring equipment: For any•equipment capable of generating such reports,I have also <br /> attached a copy of the report;(check all that apply): ❑System setup ❑Alam history report <br /> Technician Name(print): LI Signature: <br /> Certification No.: Oa ` 0 3(0 License.No.: ®-iTi_ L13 <br /> I CC 52-LA9 t5 Of <br />
The URL can be used to link to this page
Your browser does not support the video tag.