Laserfiche WebLink
ENVIRO&ENTAL HEALTAEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Donna K. Heran, R.E.H.S. Unit Supervisors <br /> Director 304 East Weber Avenue,Third Floor Carl Borgman,R.E.H.S. <br /> Al Olsen, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> c.. P• Program Manager Telephone: (209)468-3420 Douglas W.Wilson,R.E.H.S. <br /> Laurie A. Cotulla, R.E.H.S. Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209)464-0138 Robert McClellon, R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Jeff Carruesco, R.E.H.S. <br /> September 6,2005 <br /> Fax: 209 464 3565 <br /> Value Engineering <br /> Attention: Jim Cornell <br /> RE: Pacific Mini @ 4511 Pacific Ave,Stockton <br /> The San Joaquin County Environmental Health Department(SJCEHD)has received the permit to <br /> replace the existing 91 octane spill bucket at the above referenced location. The permit has been <br /> approved with the following conditions: <br /> 1. Contact the local fire department, and the San Joaquin Valley Air Pollution Control District <br /> for applicable permits and requirements. <br /> 2. Any changes in information or scope of work must be submitted to SJCEHD prior to <br /> commencing work. <br /> 3. At least one person who holds the International Code Council"UST Installer/Retrofitter" <br /> certification must be onsite AT ALL TIMES when work is performed. <br /> 4. A "Certificate of Compliance for Underground Storage Tank Installation Form C" shall be <br /> submitted by the owner or the owners'agent [pursuant to California Code of Regulation <br /> (CCR) 2635(d)] before this upgrade will be considered complete by SJCEHD. <br /> 5. If concrete is broken over the tank you must arrange the following inspection appointments; <br /> a. Corrosion protection: prior to backfilling around the spill buckets, corrosion protection <br /> of the risers must be verified. <br /> b. Overfill prevention: overfill prevention system in compliance with CCR 2635 (b)(2) <br /> must be verified. <br /> c. Spill Bucket: after concrete is poured,verify minimum 5-gallon capacity and conduct a <br /> 30-minute lake test in compliance with CCR 2635(b)(1). Proper drainage must also be <br /> verified. <br /> d. Third party tank integrity tests must be performed once concrete is poured,prior to the <br /> contractor signing off of the jobsite. The test results must be submitted to SJCEHD <br /> within 7 days of completing this project. <br /> 6. Contact Michelle Le,REHS at(209)468-9847 for inspection appointments.48-hour notice <br /> for inspection appointments is required <br /> 7. Work needs to begin immediately. Current spill containers pose an imminent threat to the <br /> environment with each delivery of fuel. <br /> 8. This permit expires 90 days from the approval date. Note: if an extension to the expiration <br /> date is required,this office prior to the expiration date must receive a written request. <br /> Thank you, <br /> Michelle Le, REHS <br /> San Joaquin County <br /> Environmental Health Department <br />