My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
2300 - Underground Storage Tank Program
>
PR0231216
>
COMPLIANCE INFO_2003-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:32:22 PM
Creation date
6/3/2020 9:46:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2008
RECORD_ID
PR0231216
PE
2361
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
01
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231216_4511 PACIFIC_2003-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ah Ah <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION t.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mui <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Moe <br /> (Check one item only THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> FACILITY ID#(Agencv Use Only) I. FACILITY INFORMATION <br /> FACILITY NAME M <br /> 03 <br /> FACILITY SITE ADDRESS C M°a CITY n r Mus <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Miu; <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT 1S SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): Mol <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). Ifyou already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,HazardouS Materials Business Plan map,etc.)which shows all required information,include it with this plan, <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) f Mill <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM Mr1�, <br /> PANEL MANUFACTURER: fn n M12 MODEL#: �[�2® Mia <br /> LEAK SENSOR MANUFACTURER: T/� nIl <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYST�D'0 MONITOR SINGLE WALL TANK(S) MODEL#(S): _ ca <br /> PANEL MANUFACTURER: M16. MODEL#: I1117 <br /> IN-TANK PROBE MANUFACTURER: Mix. MODEL.#(S): Mw <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M'-u <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): N421 C <br /> PROGRAMMED TESTS: ❑ a.0.1 g.P.11. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M22 M23 1R <br /> ❑ 3 INVENTORY RECONCILIATION ❑ a.MANUAL.PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Mei <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> t t l K5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> C" TEST FREQUENCY: a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): Mu Mn. <br /> Will'1 6_VISUAL MONITORING DONE: a.DAILY Elb.WEEKLY(Requires ageuc�approval) <br /> ❑ 99.OTHER(Specify): Mex. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT 1S: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31 <br /> PANEL MANCIFACTURER: _ Z A n M32. MODEL #• T'Lf ® M33 <br /> LEAK SENSOR MANUFACTURER; 'CAa.�n Mia. MODEL#(S): ��� ��� Mas. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ;d a YESar, <br /> ❑ b.NO M <br /> WILL,FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN'? L,a.� YES El b.NO M37 2.MECHANICAL, LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW W14EN A LEAK IS PETECTED � <br /> MLLD MANUFACTURER(s): f® ,6f°T M38 MODEL#(S): 9 �-yMi9 <br /> El3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Mao. <br /> MODEL.#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS; ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1h Mae, <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? YEg p <br /> ❑ a. S ❑ b.NO Mai. <br /> WILL.ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? a YES Mao <br /> 0 ❑�( X4.INTEGRITY TESTING <br /> ❑ b.NO <br /> C` TEST FREQUENCY: ❑ a.ANNUALLY b.EVERY 3 YEARS ❑ c.OTHER(Specify) Mas. M4e <br /> El <br /> 5-VISUAL MONITORING DONE: ❑ a.DAILY b.WEEKLY* c.MIN.MONTHLY'&EACH TIME SYSTEM OPERATED** <br /> Illi\ *Requires agenq Mai. <br /> approval °'Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR 52636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) <br /> Mon. <br /> SJCEFID-d(07/03)-1/4 <br /> 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.