My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
2300 - Underground Storage Tank Program
>
PR0231216
>
COMPLIANCE INFO_2003-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:32:22 PM
Creation date
6/3/2020 9:46:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2008
RECORD_ID
PR0231216
PE
2361
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
01
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231216_4511 PACIFIC_2003-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, MAY 2002 Page fof <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed by: Sump Manufacturer Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method' Pressure C) Vacuum drostatic <br /> Other(Specify) <br /> Test Equipment Used: VMI Equipment Resolution: .05 gph <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter <br /> Sump Depth S <br /> Sump Material: l< <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical-Penetration: <br /> Condition of sump prior to testing: 10, <br /> ®p G/ <br /> Portion of Sump Tested: 1 ) <br /> Does turbine shut down when sump <br /> sensor detects either product or water? ------- <br /> Turbine shutdown response time: <br /> Is system programmed for <br /> fail-safe shutdown? <br /> Was fail-safe verified to be <br /> operational? <br /> Wait time between applying pressure/ <br /> vacuum/water&starting test: /f fif 7! f <br /> Test Start Time: `� ® S <br /> Initial Reading(R,) CJ I Ods! <br /> Test End Time: /('' 110 O <br /> Final Reading(RF): n® / <br /> Test Duration: Gn f <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or Criteria: <br /> TEST RESULT: PASS FAIL PASS FAIL PASS FAIL PASS FAIL <br /> Was sensor removed for testing? OrYes 17 No 0 NA ( Yes C3 No C3 NA 0 Yes[3 No C3 NA C3 Yes C]No C]NA <br /> Was sensor properly replaced& <br /> verified functional after testing? Yes C3 No C3 NA ( Yes C]No C3 NA C3 Yes C]No 0 NA C3 Yes❑No C]NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.