Laserfiche WebLink
SWRCB, MAY 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed by: ❑ Piping Manufacturer Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method aPressure Vacuum Hydrostatic <br /> C) Other(Specify) <br /> Test Equipment Used: PRESSURE GAUGE Equipment Resolution: ., psi <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: ez" <br /> Piping Manufacturer: Cvo <br /> Piping Diameter: <br /> Length of Piping Run: �j Q <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure starting test: <br /> Test Start Time: <br /> Initial Reading(R,) O G' <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: <br /> TEST RESULT: JXPASS [I FAIL JaPASS FAIL L71 PASS C) FAIL, C) PASS FAIL <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />