Laserfiche WebLink
01122/2003 13:45 2094683433 F IU I H F LWfJ 06 <br /> Bader 9round Storage Tank Respuf1se Plan.page 2 <br /> The folio g equipment is Ioc vd off-site, but is available for use if needed: <br /> E ui Uent Location Availability <br /> If any spill control and clean-up ,,,quipment requires periodic maintenance, identify that equipment and describe <br /> the nawe of maintenance and maintenance Interval(s): <br /> r <br /> D. Responsible Persons <br /> The followina Ers2as)is/are responsible for autltorizin any work necessary under this res ponseIan. <br /> Name Title -p <br /> W <br /> Reporting and Record Keeping <br /> A written report (i.e. Underground Storage Tank Unauthorized Release (L }/Contamination Site Report) will <br /> be submitted to the local agency within 5 working days of a spill or release outside of secondary containment, <br /> Any spills, leaks, or water intrusion problems will be documented in the facility's monitoring records. Those <br /> records will include the date and time of the incident; the nature and cause of the incident-a description of bow <br /> the incident was resolved;and the results of any analysts perfonned in a laboratory or in the field. <br /> Monitoring records and written rep" of unauthorized releases will be maintained on-site for at least 3 years. <br /> Hazardous waste shipping/disposal records will be maintained for at least 3 years from the date of shipment, <br /> A- encUse Only <br /> "d, <br /> 1 115 -rev'ItWe <br /> v <br /> ]an <br /> Vc-]! 7 <br /> AA <br /> "N. <br /> ON-022B-2/2 Rev.07/07/02 <br />