My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
2300 - Underground Storage Tank Program
>
PR0231216
>
COMPLIANCE INFO_2003-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:32:22 PM
Creation date
6/3/2020 9:46:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2008
RECORD_ID
PR0231216
PE
2361
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
01
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231216_4511 PACIFIC_2003-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It <br /> UST SYSTEM DRAWING INFORMATION <br /> 1. Three complete sets of plans(include manufacturer's specification sheets for proposed equipment to be <br /> / installed). <br /> 2. vPlans drawn to scale in non-erasable print. <br /> 3. V/__ Plot plan to show location of tanks and all associated piping. <br /> 4. ____ Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. ____ Tank cross-sectional diagram. <br /> 6. ____ Detail of tank,associated piping,excavation and cover. <br /> 7. Tank(s)an piping pproved by a nationally recognized independent testing organization. [Title 23,Chapter 16, <br /> Article 3,Sec Ion 631 (b)&2635] <br /> 8. ✓ Verification of product compatibility with the tank(s),piping,monitoring <br /> device(s),epoxy or silicone glues,etc. <br /> 9. Manufacturer's written installation instructions for tank(s),piping,monitoring devices,etc. <br /> 10. ✓_ At the installation site,prior to installation,a tightness test shall be performed on both primary(1)and secondary <br /> (2)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. ✓lol_ Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code,Division 20, <br /> Chapter 6.7,Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> # # # # # <br /> CARACIIX <br /> bdANUFACTURFB <br /> QQMPOSIIM <br /> MODEL <br /> PRODUC <br /> CORROSION <br /> EIRMECTION <br /> ILL LISIED <br /> COMPATIBILITY <br /> IWITH 100% <br /> MPTHANOL <br /> 13. TANK(s)TO BE INSTALLED L X(5 ✓l <br /> A. Steel-clad with fiberglass reinforced plastic coatings,composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.