Laserfiche WebLink
It <br /> UST SYSTEM DRAWING INFORMATION <br /> 1. Three complete sets of plans(include manufacturer's specification sheets for proposed equipment to be <br /> / installed). <br /> 2. vPlans drawn to scale in non-erasable print. <br /> 3. V/__ Plot plan to show location of tanks and all associated piping. <br /> 4. ____ Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. ____ Tank cross-sectional diagram. <br /> 6. ____ Detail of tank,associated piping,excavation and cover. <br /> 7. Tank(s)an piping pproved by a nationally recognized independent testing organization. [Title 23,Chapter 16, <br /> Article 3,Sec Ion 631 (b)&2635] <br /> 8. ✓ Verification of product compatibility with the tank(s),piping,monitoring <br /> device(s),epoxy or silicone glues,etc. <br /> 9. Manufacturer's written installation instructions for tank(s),piping,monitoring devices,etc. <br /> 10. ✓_ At the installation site,prior to installation,a tightness test shall be performed on both primary(1)and secondary <br /> (2)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. ✓lol_ Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code,Division 20, <br /> Chapter 6.7,Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> # # # # # <br /> CARACIIX <br /> bdANUFACTURFB <br /> QQMPOSIIM <br /> MODEL <br /> PRODUC <br /> CORROSION <br /> EIRMECTION <br /> ILL LISIED <br /> COMPATIBILITY <br /> IWITH 100% <br /> MPTHANOL <br /> 13. TANK(s)TO BE INSTALLED L X(5 ✓l <br /> A. Steel-clad with fiberglass reinforced plastic coatings,composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />