Laserfiche WebLink
ENVIRONMENTAL HEALTH%EPARTMENT <br />OPQUIN c <br />a ?� Donna K. Heran, R.E.H.S. <br />0:4. Director <br />Al Olsen, R.E.H.S. <br />cq aP Program Manager <br />F o a Laurie A. Cotulla, R.E.H.S. <br />Program Manager <br />May 21, 2003 <br />Valued Engineering <br />1659 Lucerne Ave <br />Stockton CA 95203 <br />SAN JOAQUIN COUNTY <br />304 East Weber Avenue, Third Floor <br />Stockton, California 95202-2708 <br />Telephone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Unit Supervisors <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Douglas W. Wilson, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Mark Barcellos, R.E.H.S. <br />RE: 4511 Pacific Ave, Stockton CA <br />Your application for permit to install a new underground storage tank system at the above <br />location has been approved with the following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District <br />for applicable permits. <br />2. Any changes shall be submitted to EHD for approval prior to commencing work. All new <br />submittals supercede the previous ones. <br />3. If the underground storage tank and associated piping are not installed by July 1, 2003 then <br />the new monitoring system requirements and construction requirements under Assembly Bill <br />2481 must be satisfied. An addendum to this permit must be submitted and approval must be <br />received prior to commencing work. <br />4. Both primary and secondary pipes shall bear a UL label. <br />5. All pipe fittings and connections shall bear a UL label. <br />6. All monitoring systems shall be listed on the LG113-16. <br />7. All testing shall be in compliance with manufacturer's instruction, section 2635 and section <br />2636 of California Code of Regulations (CCR). Automatic pump shutdown must satisfy CCR <br />2636(g). <br />8. All piping must slope to a containment sump with an audible/visual alarm. <br />9. All equipment in contact with backfill must be corrosion protected. <br />10. Overfill prevention must satisfy CCR 2635(b)(2). The audible/visual overfill alarm must be <br />mounted in the sight/hearing range of the delivery driver. <br />11. An accurate and drawn -to scale -as -built plan must be submitted to EHD prior to the final <br />inspection. <br />12. A complete monitoring and response plan must be submitted prior to the final inspection. <br />13. All lines and tanks shall be tested for tightness, in accordance to manufacturer's guidelines <br />by a licensed tank tester and results received prior to the final inspection. <br />14. Contact Michelle Le, REHS at (209) 468-9850 for inspections. See inspection checklist for <br />the required inspections. <br />15. All inspection appointments must be scheduled 48 hours in advance. <br />ou <br />Thank <br />ank yc.�sl_�,P�. <br />Michelle Le, REH <br />IS <br />Senior Registered Environmental Health Specialist <br />