Laserfiche WebLink
"w. •• UST SYSTEM DRAWING INFORMATION <br />1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be <br />installed). <br />2. ___Plans drawn to scale in non -erasable print. <br />3. __j Plot plan to show location of tanks and all associated piping. <br />4. __j, Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />5. ___V/ Tank cross-sectional diagram. <br />6. __'_'/ Detail of tank, associated piping, excavation and cover. <br />7. _�/ Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br />/ Article 3, Section 2631 (b) & 26351 <br />8. v Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and secondary <br />(20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br />11. v Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />submitted directly to EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />12. <br />TAUV rnuonQMnu <br />TANK # <br /># I <br /># Z <br /># <br /># <br /># <br />CAPACITY <br />11000 <br />/2-1000 <br />11Mo,lc�_,11� <br />IeLj <br />OrludertJMANUFACTURER <br />rQ <br />COMPOSITION <br />p riA1Aty yh2ek, <br />W <br />l C. <br />MODEL <br />iAWA&L I) <br />6LINS STeeL t'I <br />PRODUCT <br />CORROSION <br />�ItlL«II��s <br />FbZY jl(�S) <br />U.L. LISTED <br />�5 <br />15 <br />COMPATIBILITY <br />WITH 100%METHANOL <br />(e 5 <br />5 <br />13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />_T �5 (2) Vacuum applied to interstitial space. <br />B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />5 <br />