Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN-(Page o <br /> l. DISPENSER CONTAINMENT C) G that gai2 <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING A 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b. <br /> LEAK MONITOR MANUFACTURER: 490-55. MODEL#: 490-56" <br /> LEAK SENSOR MANUFACTURER: 490-57. MODEL#(S): 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES Tzrb.NO 490.59' <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES b.NO 49(-6'- <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ] a.YES ❑ b.NO 490-62. <br /> UDC CONSTRUCTION IS: IM 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490.64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-646. <br /> VII. PERIODIC SYSTEM <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49x65. <br /> LEAK DEjkCjjQnJ&W MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.123 CCR§2644.11 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 49M7. <br /> KEEPINGVIII. RECORD <br /> The following monitoring/maintenance records are kept for this facility: 490-6s. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> . T <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49"9a <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.694. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49("9e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490.69E <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-695. <br /> ❑ OTHER(Specify): a90-69i <br /> ® This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 49(}10. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> v Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> Y The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> A The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> CONU'dENTS/ADDITIONAILINFORMATION <br /> Provide ditionalomments here or indicate how many�s es with additional information on ific monitoring pros es are attar to this pl 490-7t. <br /> ® PERSONNEL S S S <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate a possible release are investig;to ;and 3.)all monitoring records are maintained properly. <br /> THE FOLLOWING PkRSON(S)ARESPONSIBLE FOR PERFORMING THE MONITORING AND QUIPMENT MAINTENANCE: <br /> NAME: '� Z1490-72 TITLE: - �- 4 13. <br /> _C7. 490-15. <br /> NAME: ' 490.74. TITLE: c <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the 6wnedoperattor,and inform the owner/operator of any <br /> conditions that need follow-up action- <br /> XII. OWNEWOPERATORSIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490'17. <br /> ,&, <br /> REPRESENTING:❑1.Tank owner a El 2.Facility 04kner/Operator 03.Atrthonzed Representative of Ouner 49(1-16. (j <br /> APPLICANT N E print): 490-79. APPLICANT TITLE: 490.79. <br /> t a 6,V4 e`c <br /> f- <br /> L'PCF UST-D(12/2007)-3/4 www.unidoes.org <br />