My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:43:38 PM
Creation date
6/3/2020 9:46:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> �r7 <br /> VyrR=N MONITORING PROCEDURES � <br /> UNDERGROUND STORAGE TANK MONITORING PROG <br /> This monitoring program must be kept at the UST location at all times. The information on this mortilbruig �" <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County r <br /> Environmental Health Division,phone (209) 468-3420 within 30 days of any changes to the monitorin <br /> procedures, unless required to obtain approval before maldng the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name <br /> Facility Address <br /> A. Describe the frequency of performing the monitoring: <br /> Tank <br /> 1>G� <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank T k 5 S" <br /> Piping Rid <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> Ci <br /> D. List the name(s) and tide(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> E. Reporting format for monitoring: <br /> Tank .✓ivuG. <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than.every 12 months: r-, <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: c s <br />
The URL can be used to link to this page
Your browser does not support the video tag.