My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:08:30 PM
Creation date
6/3/2020 9:46:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_1997-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQLIIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑ L NEW PLAN 2.CHANGE OF INFORMATION Mui <br /> PLAN TYPE MONITORING 1S IDENTICAL FOR ALL USTs AT THIS FACILITY. m102 <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING USTSYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY(D#(AgencyUse Onln) <br /> FACILI'CYNAMB �Q �zin <br /> P M <br /> 03, <br /> FACILITY SITE ADDRESS 11 65fv d lei "Aoa CITY Mu, <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of inonitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in MN <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): M07. <br /> III. MONITORING LOCATIONS <br /> ['his monitoring pian must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). Ifyou already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Miu <br /> 1.CONTINUOUS ELECTRONIC MONITORfN OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT I a.rD b.LIQUID+FILLED ❑ c.UNDER PRESSURE d.UNDER VACUUM M(l. <br /> PANEL MANUFACTURER: C.+ m 1 L M12 MODEL#: �LS �� Mis. <br /> LEAK SENSOR MANUFACTURER: M14, MODEL#(S): Mis <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL.MANUFACTURER: MI6. MODEL#: W7 <br /> IN=TANK PROBE MANUFACTURER. Mis. MODEL#(S): M19 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M'-u <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify) <br /> nt21. <br /> PROGRAMMED TESTS: ❑ it,0.1 g.P.11, ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M22 M23 <br /> El 3.INVENTORY RECONCILIATION ❑ a.MANUAL.PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26 Mn. <br /> 6.VISUAL MONITORING DONE- a.DAILY ❑ b.WEEKLY(Requires age¢yapproval) <br /> 99.OTHER(Specify): Men <br /> V. PIPE MONITORING <br /> M NITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Man <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/rRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: a.D Y b.LIQUID FILLED ❑ d.UNDER VACUUM "431 <br /> Q ❑ c.UNDER PRESSURE <br /> PANEL MANUFACTURER: M32. MODEL,#: M33. <br /> LEAK SENSOR MANUFACTURER: M34. MODEL#(S) Mas. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TUI BINF,)SHUTDOWN? M"' <br /> a.YES ❑ b.NO <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO M37 <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DP-E " EDg, �f <br /> MLLD MANUF'ACT'URER(s): 1 I Mas MODEL#(S): �-vA M39, <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)TI IAT R UTINELY PERFORMS 3.0 g.p.h.LEAK TESTS q <br /> ELLD MANUFACTURER: Mao. MODEL.#: Mai. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a,MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 h. Mae. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? g.p.h. <br /> ❑ a.YES ❑ b.NO Mai_ <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? <br /> ❑ a.YES ❑ b.NO Maa <br /> ❑ 4.INT'EGRITY'CBST'ING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS El c.OTHER(Specify) Mas. Maa <br /> 5.VISLIAL.MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* <br /> c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** M42, <br /> "Requires agency approval **Allowed for monitoring of unburied emergency generator fuel piping only per HSC§252N 1.5(6)(3) <br /> :E1 <br /> 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(x)(3) <br /> 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> 99.OTHER(Specify) <br /> MO. <br /> SJCELID-d(07/03)-114 <br /> 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.