My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:08:30 PM
Creation date
6/3/2020 9:46:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_1997-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Moniferi.ng System Certification <br /> Site Address: <br /> Date of Testing/Servicing: <br /> F. In-Tank Gauging/SIR Equipment: heck this box if tank gauging is used only for inventory'controi. <br /> ❑ Check this box if no tank gain Bii <br /> ® L ng or SIR equipment is installed. <br /> This section trust be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes ❑ No*F14a input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Yes ❑ No* ll tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑ No* curacy of system product level readings tested? <br /> Yes ❑ No* curacy of system water level readings tested? <br /> es ❑ �No* ll probes reinstalled properly? __j <br /> Yes I ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * <br /> In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment citrtification, was a leak simulated to verify LLD ddisabled <br /> ❑ N/A (Check all that apply) Simulated leak rate: g.p.h.; ❑0.1 g.p.h ; ❑0.2 g.p.h. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Y s ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* Foe mechanical LLDs,does the LLD restrict productflow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes �❑ 14o* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> Q N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring syste0"N/A or disconnected? <br /> � Yes ❑ No* For electronic LLDs, does (lie turbine automatically shut off if any portion of the monito <br /> .OWN/A malfunctions or fails a test? <br /> 3 Yes ❑ o* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> i N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> I. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.