Laserfiche WebLink
• • . <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORIi TG PROGRAM <br /> "This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 46&3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before snaking the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name /`/ci» s If dr s <br /> Facility Address 3,30/ / n,�,, Lah e- <br /> A. Describe the frequency of performing the monitoring: <br /> Tank S�,'z/C � - 46n ,4,/ 1-4,) %;�hfxh <br /> Piping ". � � ors — p�hti�J Jr� lis <br /> B. What methods and equipment, identified by name and mode:, will be used for <br /> performing the monitoring: <br /> Tank <br /> Pipin 'heo!. GZ sll -1�7rZ-,6 <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> / 30J ze,-) �!'��1/tr•�k G� <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> rr v <br /> /�Do1 �1�L.m4r, G/c✓� <br /> E. Reporting format for monitoring: <br /> Tank e-1 <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every L months: <br /> G. Describe the training necessary for the operation of UST system. including piping, <br /> and the monitoring equipment: Dh e, v <br />