Laserfiche WebLink
EW UST INSTALLATION INSPECTION RECORD Aft <br />FACILITY NAME:Y� ADDRESS: <br />FACILITY ID# TANK# UL# Pi-A6110t( TANK MODEL/MATERIAL: <br />CAPACITY: PRODUCT: � ` R.E.H.S: .- <br />A I <br />P N <br />P I <br />R T <br />0 I <br />V A <br />E L <br />D S <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />® 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br />j� 2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTIONS <br />(' <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: j-j.LAP: PSI: H IN• i 0 BRINE(LIQUID ANNULAR): OTHER: <br />(CCR <br />2636 <br />(e)) <br />4. PRIMARY TANK TE : PSI: HRS/MIN: <br />7 <br />SECONDARY PIPING CONTAINMENT TEST PSI: HRS OTHER: <br />(CCR <br />TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) / /yl <br />(CCR <br />2636 <br />(e)) <br />/' <br />P 7. <br />SECONDARY PIPING CONTAINMENT TEST PSI: HRS OTHER: <br />(CCR <br />2636 <br />(e)) <br />�f <br />of 8. <br />LAKE TEST ON ALL SUMPS (24 HR. MINIMUM)-- HRS: <br />(CCR <br />2635 <br />(a) (4)) <br />(CCR <br />9. <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />PEI <br />r 16. <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />10. <br />OVERSPILL PERFORMANCE TEST <br />(CCR <br />2635 <br />(b) (1) (C)) <br />17. <br />T 11. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR <br />2636 <br />(b)) <br />®' <br />2. <br />PIPING SLOPES TO COLLECTION SUMP <br />(CCR <br />2636 <br />(c)(1)) <br />FINAL INSPECTION <br />COMMENTS: _1i7 r � =1,:7 4® <br />EH23-006 9/95 <br />10 <br />3. <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES <br />(CCR <br />2632 <br />(c) (2)) <br />14. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR <br />2632 <br />(c) (2)) <br />15. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR <br />2643 <br />(c) (1)) <br />r 16. <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR <br />2636 <br />(g)) <br />17. <br />BALL FLOAT VALVES INSTALLED <br />V,18. <br />OVERFILL PROTECTION INSTALLED/APPROVED <br />(CCR <br />2635 <br />(b) (2)) <br />L/ <br />J51e 19. <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) <br />API <br />20. <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR <br />2635 <br />(a) (5)) <br />21. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CCR <br />2632 <br />(d)) <br />2. <br />"C" FORM COMPLETED AND SUBMITTED <br />(CCR <br />2635 <br />(d)) <br />2® <br />'� 23. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />(CCR <br />2630-2636) <br />24. <br />ALL CONDITIONS MET; FACILITY PERMIT ISSUED <br />(H+S <br />CODE <br />25284) <br />COMMENTS: _1i7 r � =1,:7 4® <br />EH23-006 9/95 <br />10 <br />