R' . MATBRAAL AND WORKIISAISSUREP
<br />L • UNLEN OTHERWISE SPECIFICALLY PROVIDED N THESE DOCUMENTS, ALL
<br />ECUFMIENT, MATERIAL, AND ARTICLES INCORPORATED N THE WORK
<br />COVERED BY THESE DOCLI19WO ARE TO BE NEW AND OF THE MOST SUITABLE
<br />CIPLADE FOR THE PROCESS INTENDED.
<br />-. THE CONTRACTOR MALL FURNU5W TO THE OUJINERS AUNT FOR HS
<br />APPRbOVAL THE NAME OF THE MAMPACTURER, THE MODEL ALS
<br />OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE
<br />CAPABILITY, MATURE, AV RATING OF THE MACHINERY AND
<br />MECk&WCAL AND OTHER EQUIUNION THE CONTRACTOR CONTEMPLATES
<br />INCORPORATING N THE WORK WEN REWIRED BY THE OWERS AGENT
<br />3. WHEN p DY THESE DOCUMENTS OR WHEN CALLED FOR BY THE
<br />CUM" AGENT THE C4MTRACmTOR SHALL FURNISH THE AGENT FOR
<br />APPROVAL RILL WOMMAWON CAPHOEMNIMa THE MATERIAL OR ARTICLES
<br />WHICH WE C414TEMPLATES INCORPORATING N THE WORE WHEN 60
<br />DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE
<br />CONTRACTOR'S RXIMft, WITH AL1. SHIPPING PREPAID.
<br />4. MACHINERY. ECUIPMElTT, MATERIA, AND ARTICLES INSTALLED OR USED
<br />WRHOA REMIXED AL- SHALL BE AT THE RISK OF 81 Q.BNT
<br />5. ALL WORK TO BE DOE N ACCORDANCE WITH APPLICABLE COOE6 AND
<br />REGULATIONS.
<br />6. ALL MATERIALS SMALL BE INSTALLED PER MIANLFACNIRER'S INSTRACTIOS
<br />AHD THESE DOCUMENTS. CONFLICTS SHALL DE DROUGHT TO THE ATTENTION
<br />OF THE ENGINEER.
<br />I. F ANY OF THEM DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR
<br />LOCAL MISCO A6 ARE CU WA94ILY N EFFECT AT THE TIME OF THIS
<br />IT S EXPECTED THAT TGE MOST RESTRICTM.E CONDITIOWS)
<br />WOULD APPLY.
<br />1. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING
<br />CCURM PRIOR TO THE START OF WORK CERTIFICATION OF THIS MUST BE
<br />PROVIDED TO THE OUNERS ENGINEER PRIOR TO THE START OF WON .
<br />-. CONTRACTOR EMPLOYEES TO HAVE C.ETED THE PIPING M YNP
<br />TRAINING REGIUNREMENTS N ACCORDANCE WITH SS4 CALFOR41A LST
<br />FINOLLATI" CERTIFICATES SMALL 219 PROVIDED TO OWNER
<br />CONTRACTOR SHALL CZMPLETZ THE PIPING INSTALLATION CHECKLIST
<br />SUPPLIED PIPING MANUFACTURER AND SMALL FURNISH THE CMCKL16T TO
<br />OWER
<br />3. CONTRACTOR TO HAVE ISM TRAINED AND CERTPED BY THE TANK
<br />MANUFACTUMM N CORRECT TALK INSTALLATION N ACCO DAUNRCE WITH 1954
<br />CALIFORNIA UST MISGULATICNG. CERMICATE6 SHALL BE PROVIDED TO
<br />CURER CCNTRACTOR SHALL COMPLETE THE TANK ISTALLATION CHECKLIST
<br />SUPPLIED TANK MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO
<br />4. CONTRACTOR SHALL HAVE THE FOLLOWING LI
<br />A GENERAL EMBINEERING "A'
<br />B. MATERIAL SU86TANCE HANDLING ('HAZ")
<br />S. OR SHALL HAVE THE FOLLOWING INSURANCE. CCNITRACTOR SHALL.
<br />HAVE PROOF O SUCH INSURANCE ON FILE WITH OLDER BY NAMING OWNER
<br />AS "ADDITIONAL .
<br />A STATUTORY WOR FMAM6 0211PREMEN&VE LIABILITY
<br />Ek C421PREMENSIVE GIENERAL LIABILITY. WITH A COMBINED SINGLE
<br />LIMIT OF NOT LESS THAN Np00p00 PER OCOuXXBqcv FOR BODILY
<br />WUI RY ALND PROPEItTy DAMAGE.
<br />G AUrCV40LE LIABILITY COVERING I= OF ALL OUGM HIRED
<br />VBHKiES WITH A C42101NED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY
<br />OF NOT LEN THAN Mp00APOO PER OCCURRENCE FOR BODILY NAw Am
<br />FIROF49RTY DAMAGE.
<br />6. GENERA COHTRACTOR TO FLUSH ALL LABOR MATERIAL, Sal"IM, AND
<br />SERVICES NECESSARY FOR OR REASONAMY INCIDENTAL TO THE
<br />SATISFACTORY CCIMPLETICN OF ALL WORK SHOWN OR CALLED FOR OR
<br />REQUIRED BY THE
<br />1. ALL WOW SHALL Off PERFORMED N ACCORDANCE WITH THE UNIFORM
<br />BUILDING CODE, UNIFORM FIE CODE, NATIONAL ELECTRICAL CODE,
<br />CALIFORNIA UNPIRMOMOUND STORAGE TAM MECKLATIONG, OSHA
<br />CO GIR CTIOiN SAFETY ORDERG, AND ANY OTHER APPLICABLE STATE, CRY,
<br />OR COUNTY ORDINANCES
<br />A PETROLJ DEMO PERMTT6 TO BE SECURED BY OWER MSC PERMMS,
<br />AS MEAUXISO, SHELL BE SECOND BY CONTRACTOR WHO IS IMOPONSIBLE
<br />FOR COMPLYING WITH ALL PERMIT CONDITIONS.
<br />'I CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF OF ALL
<br />EXISTING CONDITION PRIOR TO 6jS MITTNG HIS ISO.
<br />10 GENERAL CONTRACTOR SMALL PIRIOTIECT ALL EXISTING FACILITES TO
<br />NOTED OTHERWISE CONTRACTOR SMALL REPAIR OR
<br />REPLACE TO i:8 SATISFACTION OF THE ATNE ANY
<br />EXIST PACLfrIE6 THAT s BY THE CONTRACTORS
<br />IL ALL EXCAVATION* SMALL DE FSWOMW N COMPL.IANGE WITH OSHA AND
<br />STATE REGULATION& THE CONTRACTOR 16 TO THE OSHA
<br />9D CAVAT ALSO TFRMNC44M OPERATIONS, FOR A SAFE WORK
<br />PRACTICES GUM MR PERFORMING EXCAVATION WORK,
<br />Q. LP'ON commzrm OF riwacT, CONTRACTOR SHALL PROVIDE OWER WITS
<br />-AAS BULL DRAWINGS OF ALL ITEMS (STALLED BY SAME. 'AS BU LTS'
<br />SMALL LL ON-SITE WITH INFORMATION NOTED DIRECTLY ON
<br />JOB COPY.
<br />13. HOT USED
<br />W. CONTRACTOR SHALL COORDINATE ALL INSPOCrIONS, AND APPROVALS.
<br />B. GOLERMNG CODESAs STANDAR DS INCLUDE, BUT SHALL NOT DE LIMITED
<br />TO, THE STANDARDS OF THE FOLLOW
<br />NATIONAL STANDARDS INSTITUTE (ANSI)
<br />AMERICAN PffTMOLl!UH INSTITUTE (N)
<br />SOCIETY FOR TESTING AND MATERIALS (.ASTM)
<br />UNIFORM BUILDING CODE (Lac)
<br />NATIONAL ELECTRIC CODE (NEC)
<br />NATIONAL ION AGENCY (NFPA)
<br />UNDERWRITE" LABORATORIES, NO. (IAN
<br />CALIFORNIA CODE OF REGULATIONS (CCR)
<br />LOCAL ORDHAMM
<br />10. SAFETY PLAN, CONTRACTOR SHALL DEVELOP AND HAMAN FOR THE
<br />DURATION OF THE CONTRACT A SITE HEALTH t SAFETY PLAN THAT WILL
<br />EFFECTIVELY INCORPORATE AV IMPLEMENT REQUIRED SAFETY PROVI610N8,
<br />FOR TA KJLIE REMOVAL AND MTAL-LATICN, PRIOR WORK. START, AND,
<br />A, APPOINT AN EMPLOYE! AS THE SAFETY OTICER WMO I6 dLALANED
<br />AND-WHORZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH TIE
<br />HEALTH AND SAFETY PLAN. SUBMIT THE NAME AND QUALFCATIONS OF
<br />THE SAFETY OFFICER TO THE OUINERM AGENT PRIOR TO WHORL
<br />ON THE SITE.
<br />B, THE PLAN SHALT. CONTAIN THE NAMES, ADDRESSES AND TELEPHONE
<br />NUMBERS OF THE SUPERV18ORYPERBONNEL. TIE 408MTAL- FACILITIES
<br />NEAREST THE SITE, AHD A MAP TO THE WO WTAL PROCEDURES SHALL. BE
<br />MPOTTBN N THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS
<br />OR WAZARDOUS SUBSTANCES BE UNCOVERED.
<br />C, CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH EMPLOYEES AND
<br />SUPPLY THE MEETING MIN UTE6 TO OWER WHEN REQLEOTED.
<br />D, F DURING THE COURSE O THE UJORK, UNSAFE CONDITION DEVELOP
<br />OR APE W11COURTSM110, TAKE IMMEDIATE MEASURES TO CORRECT THE
<br />CO1DITICN. F THE C4111IMECTIVE ACTION 16 INSUFFICIENT N THE
<br />OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL
<br />CCIRRECTNE ACTION CAN BE IMPLEMENTED.
<br />E, PRIOVIDS A MNRILM OF TWO FIRE EXTNGUUGHER'S WITH A MINIMUM
<br />CLASS RATING OF 2 -A$0 -DNC WITHIN 50 FEET OF THE OPERATION.
<br />M. UNDEMSMOUND SERVICE ALERT (USA) - THE CONTRACTOR SHALL NOTIFY
<br />OF U.$MA. 2 FILL WORKING DAYS N ADVANCE OF PERFORMING
<br />ANY EXCAVATION WORK BY CALLING THE TOLL ONS -CALL PROGRAM
<br />NUMBER i SOO) 221-2600.
<br />.OMC
<br />I. PRS TO THE START OF WORK PROVIDE OONEIR WITH WORK PLAN AND
<br />TH4AT ALLOWS THE SITES STORE TO REI`AN OPEN TO THE
<br />FULLEST EXTENT POSSIBLE.
<br />2. PO4CE OFF WORK ALFA WITH 6' HIGM CHUAN LINK INCE. POST P
<br />OUT* SIGNS ON FEPNCE EVERY 30 FEET. AT THE END OF EAON WORK DAY
<br />SECURE FENCING PANELS TOGETHEIR
<br />3. FLUSH, CO. AND REMOVE PRODUCT LINES FROM EXISTING TANKS TO
<br />D ISLANDS.
<br />4. REMOVE ALL EXISTING REL DISPONSERS, ISLANDS, BARRICADES, FUEL
<br />LIES, ASPHALT AND CONCRETE SURFACES AS REaJIFED, N
<br />PREPARATION FOR INSTALLATION OF NEW AS SHOWN ON DRAIJUNW. ANY
<br />SALVAGEABLE TO DE FROM SITE AS DIRECTED BY
<br />OWNER 9ENTATNE
<br />5. WILL CONTRACT WITH AND RSINISH CONSULTANTS TO PERFORM SOL
<br />AMD/014! WATER TESTING UPON PIPING REMOVAL IN ACCORDA MCE WITH
<br />PIPING REMOVAL. PLAN AND LOCAL REGULATIONS.
<br />6. CONTRACTOR SMALL PLACE EXCAVATED SOIL ON, AND SMALL COVER WITH,
<br />4 ML. PLASTIC UNTIL SOL HS REMOVED, MOVED, ANY SOL TO BE STOCKPILED ON
<br />SITE FOR SAMPLING PRIOR TO OP -HAUL BY OTHERS AS DIRECTED BY
<br />OWER
<br />I. OWER &,ALL PROV06 FOR TRANSPORTATION'. AND DISPOSAL. OF ALL
<br />EXCAVATED SOIL AFTER COMPLETION OF ANY NECESSARY RE EDIATICK
<br />INCLUDING AERATION
<br />8. F REGI UIRED FOR ABANDONSIP EXCAVATION, BACKFILL ONCE ALL SAMPLING
<br />AND/OR OVER -EXCAVATION 16 COMPLETED. BACKFILL MIST BE ENGINEERED
<br />FILL COMPACTED TO W%. THE CONTRACTOR N RESPONSIBLE FOR
<br />CERTIFYING THE COMPACTION,
<br />S EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW EQUIPMENT.
<br />D. INSTALL "TYPAW RFLTEFt PAM= LINER N PIPING TRENCHES, PER
<br />BY SITE CONDITIONS.
<br />IL INSTALL EOL P EHT AS LISTED IN OUNEWS EdUPME MT LIST INCLUDING
<br />SAL 1AGEABLE ISGUIPMENT TO BE REINSTALLED F ANY. AND PROVIDE ANA
<br />INSTALL ALL OTHER EGIUIPHIINT A0 REQUIRED TO PROVIDE A OCIlIPLIETE
<br />PETROLEUM SYSTEM
<br />12 PROVIDE AND INSTALL NEW PRODUCT 1,1eM, VAPOR AND SECONDARY
<br />CONTAINMENT LIES PER OMAUMM CURRENT
<br />INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND *HALL NAVE
<br />PWECED9NCE OVER OTHER INSTRUCTIONS. MANUFACTUREPM CHECKLISTS
<br />SMALL DE BY THE CONTRACTOR A$ EACH STEP 16 COMPLEMD
<br />A, PRODUCT PIPIN& 2- PRIMARY PIPING WITH 3' CONTAH HENT
<br />SYSTEM A6 AF14IDvW BY OWNER. ALL PIPING AND CONTAINMENT SYSTEMS
<br />SMALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT SYSTEM SHALL
<br />BE RST T1E SAME MANUFACnIRER WITH THE SAME SEFM ADHESIVES
<br />AMD/OR FITTINGS.
<br />9% VENT/VA PPI W RED THREAD IIA ANA RED THREAD 11 WITH
<br />FITTINGS, AND 1000 AND SOW SERIES ADHESIVE, OR AM'EiRO N DUTALOY
<br />300M WITH ALCOHOL FITTIN&SAND RP40 ADWANX DO NOT MDC
<br />MANN MATERIALS,
<br />G PERSONS INSTALLING PIPING MIST BE CERTIFIED AS, HLAVI M BEEN
<br />TRAINED BY I'IANUPACTUMM
<br />D, STEL PPE, ALL METAL PIPING SMALL BE BLACK INTI
<br />40, OR 911MA STRONG. GAL'/AN= MPE IS NOT ALLOWED. NTTNG$
<br />SHALL BE 300 FW MALLEABLE IRON.
<br />E, ALL STEEL PIPE DELCW GRACE 16 TO BE DOUBLE WRAPPED WITH 20
<br />MIL. Ps_' PIPE WRAP, OVER A PIPE WMAP FOR USE WITH VINYL
<br />TAPES, AND SHALL BE BY TIE SAME MANUFACTURER As THE Wt AP
<br />R ALL THREADED CONECT SHALL WITH NALAHT
<br />WHICH $HALLO BE CURRENTLY UARRWW BY tt*WACPJMR MR FILL
<br />ATIBLITY WITH THE MPNG MATERIAL USED, AND FOR LINE WITH
<br />PETROLEUM SOLVENTS, BELS, OL$, POOL, AND 100% METHANOL, WHICH
<br />SMALL BE ASIRIFIED DT CURRENT MANUFACTURIEW6 PRODUCT DATA BEET.
<br />G: GNC, SHALL DEMONSTRATE TOREPRESENTATIVE THAT ALL
<br />MATERIALS AM NEW AND CONFORM TO ABOVE SPECIFICATIONS,
<br />13. DO NOT PLACE PIRA PIPING UNDER ]BUILDINGS. PIPING RM OvER
<br />TAMKb SMALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS SHOWN ON
<br />.141 Mi OTHER LINES APA CONEXUT. P PIPING
<br />16 NOT SHOWN ON HTE PLAN, GUC. SHALL RUN LIMES THE M06T DIRECT
<br />RCUM SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE.
<br />14. PIPl,* SYSTEMS SMALL BE TESTED PER CURRENT MANUFACTURE]"
<br />INSTRUCTIONS $:41LL BE FOLLOWED AT ALL TIMES. AND SHALL HAVE
<br />PRECEDENCE OVER OTHER INSTRUCTIONS,
<br />A, GC. TO NOTIFY 0"" SENTATIVE TWO WORKING DAY$ PRIOR
<br />TO LINE TESTING, OWNER'S PEPREWNTATIVE $HALL WITNESS ALL LINE
<br />TESTING. MARC TESTPRESSURES ON GAUGE WITH ELECTRICAL TAPE AT
<br />BEGINNING OF TESTS, PRESSURE SHALL HOLD FOR AT LEAST OE (1)
<br />HOAR APD BE WITNESSED BY CUM" IEP{RESIENNTATNE. DO NOT BACKFILL
<br />UNTIL AUTHORIZED BY OWER•6 REPRESENTATIVE.
<br />B, TEST PRE6 SHALL BE,
<br />" - S0 PSI AHD APPLY SOAP SOLUTION.
<br />3' - 40 PN AND APPLY SOAP SOLUTION.
<br />3' - SECONDARY - 5 PN AND APPI.Y SOAP SOLUTION.
<br />C. CAUTION, DISCONNECT FLEX COIECTOR FROM STP AND CAP PRIOR
<br />TO T'$STW- APPLY 1 RELEASE PRESSURE SLOWLY. VENTNAPHOJR SYSTEM
<br />SMALL BE TESTED FROM TOP OF `BJT, THROUGH MANFOLOM EXTRACTOR
<br />DAGRAND MISER STA GE I CONTAINMENT MANNOL.E6, STAG! it 'VAPOR
<br />LIES TO ISLANDS AND STAGE II FLEX CONNECTORS AT D S).
<br />D. SLOWLY PRESSURIZE PRODUCT LINES AND VENTNAPOR SYSTEM TO 50
<br />N
<br />P. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS AID FITTINGS,
<br />CORRECT ANY LEAKS AND RETEST.
<br />E. SLOWLY RELEVE PRESSURE FROM VAPOR/v%M SYSTEM AND REMOVE
<br />PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LIME
<br />PRESSURE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVING I$
<br />COMPLETE.
<br />F. SECONDARY PIPE MUST DE PROPERLY CUNT. INSECT ALL PRIMARY
<br />PIPE SURFACES. PRENUIZE SECONDARY PIPE TO 5 PSI AND SOAP ALL
<br />MR°! SURFACE AND FITTINGS. PRESSURE ON THE PIPING SECONDARY
<br />SPACE SMALL BE MAINTAINED UNTIL AFTER THE PAVING S N PLACE OVER
<br />TAW FIELD AND PIPIG RUNS, AID SMALL Be WITNESSED BY THE
<br />REPIRESENTAMR.
<br />G. AFTER BEING WTNE$SED BY OWER°$ REPRESENTATIVE, REMO'vE
<br />PRESSURE FROM PRODUCT LIES AND AIR FROM SECONDARY LIES AFTER
<br />PAVING S N PLACE
<br />D. GNC. $HALL PERFORM PRECISION TEST GN PRODUCT LINES AFTER PAVING
<br />IS AND PRIOR TO FINAL PROJECT ACCEPTANCE. PIRECISION
<br />LINE TEST SHALL DE N ACCORDANCE WITH NHPA 329, LOCAL
<br />OR APPROVED EQUAL. TEST SHALL DE CONDUCTED BY A
<br />CERTIFIED TROTIM GNC. SHALL PROVIDE WRITTEN REPORT OF PIEC161O1
<br />TEST TO OWERR`S REPRESENTATIVE PRIOR TO CUM" ACCEPTANCE OF
<br />PROMCT.
<br />S. CONTRACTOR SMALL PROVIDE DOCUMENTATION O A DYNAMO SACKPIRIESSURE
<br />?EST OF ALL VAPOR RETURN LIES A$ IEGWRED BY LOCAL REGULATIONS,
<br />n. CONTRACTOR SHALL DO ANY OTHER TESTING AS REWIRED BY LOCAL
<br />MISMILATtONS,
<br />18 CONSTRUCT NEW REL NLANDS A$ SHOO ON DRAWINGS.
<br />19. BRAVO BOXES TURIMME SUMPS AND OVERFILL ]BOXES APE TO BE
<br />COMPLETELY SEALED ANMD WATER TESTED, AS EVIDENCED BY ODUIER'6
<br />REPRESENTATIVE AS FCLLCW 16
<br />L RLL WITH WATER TO HIGHEST PENETRATION.
<br />2 SPRAY PAINT TOP OF WATER
<br />20. PROVIDE AM INSTALL CC DUIT U WPMG FOR PETROLEUM STSTEM1(6).
<br />PROVIDE CO PW FOR FUTURE CARDIREADEft ATD 0 1' ,CIX SITE
<br />ELECTRICAL AS INDICATED ON THE DRAUW1,106.
<br />2L INSTALL MONITORING SYSTEM WITH INTERSTITIAL PROWS, TURBINE SUMP
<br />AAD TANK GAUGES, AND MONITOR CONTROL PANEL N BULDM
<br />PER DIRAWINGS,
<br />22. INSTALL NEW DISPENSERS. ANA CONTROL EGIRIPMEMT
<br />AS INDICATED ON SITE PLAN AND DESCRIBED, IN THE 114UPMONT LIST.
<br />23. #STALL. GBL C40NCREM TANK AND DRIVE SLABS, AND OTHER CONCRETE AS
<br />'RED ON SITE PLA -L CONCRETE 09ALL HAVE A MINIMUM
<br />STRENGTH AT 29 DAYS OF 2500 PSI.
<br />24 REPAIR AND/OR REPLACE AC. PAVING AND BASE TO MATCH ORIGINAL N
<br />AREAS DISTURBED BY WORK
<br />28. AM 84VIRONMENTAL WORK REWIRED OUTSIDE THE ABOVE SCOPE OF WOW
<br />SMALL BE DONE ON A THE ANO MATERIAL$ DABS. RENAL RECEPM,
<br />SUISCONI'MACron #NOtClt! MATERIAL RECEIPTS, AND DAILY LABOR TIME
<br />SHEETS SHALL BE REG%IRED TO SUPPORT 41914111RAL CONTRACTOR TIME AND
<br />MATERIAL M/DICE& SUCH WORK SHALL BE BILLED SEPARATELY.
<br />2D CLOSURE PROCEDURE -REMOVAL O TANKS,
<br />SAN JOACUIN CONT( EMARO•ME NTAL HEALTH DIVISION TANK CLOSURE
<br />GUDELWM AND SOIL AND GROUNDWATER SAMPLING GUIDELINES
<br />SHALL. BE FO.LOUM EXCEPT WERE THE FOLLOWING SPECIFICATIONS
<br />ARE MMOE RESTRCTIVE.
<br />REMON/E ALL PRODUCT FROM TANG$.
<br />REMOVE ALL RESIDUAL LIQUID, GOLDS, OR SLUDGE&
<br />PUbRGME ALL 'VAPORS FROM TANK$ WITH A MINIMUM OF THIRTY (30)
<br />PONDS OF SOLID CARBON DIOXIDE (PRT ICE) FOR EACH 1000 GALLONS
<br />OF TAM CAPAOTY AHD PRESENT SALE$ SLIPS TO INSPECTOR
<br />PELLETIZED DRY CE IS RECOMMENDED. GIP ,ALL OPEN0436 EXCEPT
<br />`VENT PIPE AND ALLOW TWO HOUR MN#WM AND SIX HCWR MAX#AJM FOR
<br />OXYGEN DISPLACEMENT AFTER PUTTING CARBON DIOXIDE INTO THE
<br />TANKS. VDNT PPE OPENING TO RE CHECKED WITH A COMBUSTIBLE GAS
<br />DETECTOR TO DETERMINE F TANK IS VAPOR FREE OR F ADDITIONAL
<br />DRY ICE AND/OR TIME MAY BE REQUIRED.
<br />P7.UG OR CNP ALL TAM OPENINGS, LEAVNG AN VS' - V4' PRESSURE
<br />RELIEF HOLE IN ONE CAP AT THE TOP OF THE TANK.
<br />VISUALLY INSPOCT THE TANKS UPON REMOVAL ALL EXTERNAL TANK
<br />SURFACES AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLES
<br />OR LEAKAGE. THE RESULTS OF SUCH INSPECTION SHALL EE
<br />DOCUMENTED N WITH PWOTOlftAPM6 04M APPROPRIATE.
<br />PATCH ANYHOLES WITH APPROVED MATERIAL BEFORE TRANSPORTING
<br />TANKS TO DISPOSAL SITE.
<br />TWO SOL SAMPLES SHALL BE ANLALY=O FROM BENEATH THE TAMC ONE
<br />FROM DIRECTLY BENEATH THE FILL PIPE. THE OTHER PROM A SIMILAR
<br />POSITION AT THE OPPOSITE END OR THE TAMC F OBVIOUSLY STATED
<br />OR CONTAMINATED AREAS EST N LOCATIONS OTHER THAN THE ABOVE
<br />LOCATIONSTHEN ADDITIONAL SOL SAMPLES SMALL BE ANALYZED FROM
<br />THERE OBAOUOLT STAINED OR CONTAMINATED AREAS.
<br />SOIL SAMPLES SHALL BE COLLECTED FROM THE NATIVE SOL AT OR
<br />JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOL
<br />SAMPLES SHALL BE TALKE4 USING A DRIVEN -TUBE TYPE SAMPLER
<br />CAPPED ANMD SEALED WITH VERT MATERIALS. FORMAL, OIGHW CHAIN -
<br />OF -CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND
<br />SUBMITTED WITH THE RESULTS TO TLE RE50ULATIG AGENCY.
<br />TO EXPEDITE THE PROCESS OF TANK REMOVAL, THE FOLLOW43
<br />ALTERNATIVE SAMPLING METHOD MAY BE USED,
<br />A. MMEDWTELY LPON REM10✓AL. OF THE TARING, A BArGOdOE BUCKET OF
<br />HATNE SOIL SHALL BE TAKEN ARCM THE NATIVE SOIL TWO (2) FEET
<br />BELOW THE SOLADACKFLL MAERRFACE THIS SOL. SHALL BE RAPIDLY
<br />BROUGHT TO THE SURFACE.
<br />8 APPROXIMATELY THREE INCHES SHALL BE RAPIDLY SCRAPED AWAY
<br />FROM THE SURFACE OF T146 SOIL. THEN A CLEAN BRAN TUBE (AT
<br />LEAST I INCURS LONG) SHALL NE pRIVRN INTO THE SOL WITH A
<br />SUITABLE INSTRUMENT (WOODEN MALLET, ETC.).
<br />C. THE ENDS OF BRASS TUBE SHALL BE COVERED WITH ALUMINUM FOIL,
<br />THEN PLASTIC END CAPS. AND FINALLY WRAPPED WITH A SUITABLE
<br />TAPE.
<br />D. THE *AMA $HALL BE IMMEDIATELY PLACED ON kms, OR DRY M
<br />FOR TRANSPORT TO A LABORATORY. AGAIN, FORMAL. GRAN -CP -CUSTODY
<br />SMALL BE MAINTAINED AND SUBMITTED FOR EACH SAIMPL.E.
<br />F THE BOTTOM OF THE TANK S BELOW THE GROUNDWATER TApLE. THEN
<br />SOL SAMPLES APE NOT REGURIED. N THIS CASE, A WATER SAMPLE
<br />SHALL BE COLLECTED AS SOON A6 P066ME FROM TIE SURFACE OF
<br />T}E GROUNDWATER IN THE EXCAVATIO. A CFECK SMALL INITIALLY BE
<br />MADE FOR ANY FREE FLOATING PRODUCT. F NO FLOATING PRODUCT S
<br />THEM A WATER SAMPLE SHALL IE TAKEN WITH A DEVICE
<br />PEOMED TO REDUCE THE LOW OF VOLATILE OCHPONIENT& A BALER
<br />16 A SUITABLE SA1"PLN0 DEVICE. TFE WATER SAMPLE SHALT BE
<br />-
<br />IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL
<br />WITH A6 LITTLE AGITATION AS POSSIBLE A TEFLON SEPTUM SHALL BE
<br />USED TO SEAL TIES VIAL
<br />SOL AND WATER SAMPLES, SMALL 158 ANALYZED FOR TOTAL
<br />BY THE METMODS OUTLINED N % WDELIE6 FOR
<br />ADDIRESONG FUEL LEAKS. CALIFORNIA REGIONAL WATER QUALITY
<br />CONTROL BOAyRD, SAN FP-44CIOW DAY REGION • SEPTEMBER fes.°
<br />LOAD TANKS ON HIGHWAY CARRIER WITH PRESSURE RELIEF MOLE UP OH
<br />SAME DAY AS REMOVAL. U#LESS THE TANG" HAVE BEEN TRIPLE RINSED,
<br />THE C.NRRHER MIST BE A LICENSED WASTE HAULER AND MANIFESTO
<br />MUST ACCOMIF'ANY THE TANKS.
<br />3D REMOVAL OF PIPING
<br />PIPING TO IN MEMMW SHALL iE EMPTIED OF ALL C0MYE M6 PRIOR TO
<br />REMOVAL PIPING SHALL Me STOCKPILED ON-SITE PRIOR TO DISPOSAL
<br />VISUALLY INSPECT PPE TRENCH POR INDICATION OF LEAKAGE. A SOL
<br />SAMPLE SHALL BE TAKEN ANA ANALYZED FOR EACH TURINITY LINEAL
<br />FEET OF TMENCFH IF INSPECTION OF TRENCH REVEALS EVIDENCE OF
<br />LEAKAGE. FOLLOW PROCEDURE LISTED N SECTION 20 FOR &WRI-NG
<br />ANA A 44L.YOW
<br />FLAME
<br />LIQUORS, INC.
<br />1301 W. KETTLEMA N LAME
<br />LM, CA 95242
<br />209-334-3233
<br />AFN 031-040-05 t 06
<br />ALMS
<br />ENOIN83". INC.
<br />PUJ. DOX ID
<br />E143 MiSca LAME
<br />UVBT 8 O, CA 106 -BI
<br />(916) 312 -
<br />PAX 313-In2
<br />DM CR404116
<br />07 #WYt1A AS
<br />FRMIRM O 5N.914 0006§PM W.
<br />xD 0F69111tlM E � POR AM/ FHltlK+N
<br />rnri- 111.tHHWI rit rHW9
<br />OSIMMLipomAmpTPMORIONIS
<br />B6NH. T171'!! COR
<br />UUR7i
<br />RmaaGmotamea H w
<br />Np.
<br />COPYRIGHT 0 1997
<br />►-AAAA.
<br />YALG SON, TROTOO POUT
<br />10 GENERAL RFORMAATION
<br />U LOCATION OF TANGS,
<br />FLAME LION , INC.
<br />IL
<br />W KETR.EMAN LH
<br />LODL CA 98240
<br />1209) 334-3233
<br />12 OJI,ER,
<br />PETE GRAMIGNA,
<br />1301 W KETTLEMAN LN.
<br />LOCI, CA 0240
<br />( 209) 334-3233
<br />13 PICT START
<br />16 FEB 96
<br />1,/ TO Be REMOvvtD,
<br />3 61L U$Te G k7A0O GALS.
<br />M CONTRACTOR,
<br />WAL.TON ENGINEERING, INC.
<br />GEOLOGIST,
<br />GRAYLAND ENVIRONMENTAL -
<br />2131 QUAL. ST.
<br />OAVI6, CA 98616
<br />JEFF CLAYTON (916) 186-1.141
<br />LABORATORY,
<br />CLS (STATE CERT. 1233)
<br />3083 GOLD CARNAL DRIVE
<br />RANCHO CORDOVAA, CA 95610
<br />(916) 639-1301
<br />2D CLOSURE PROCEDURE -REMOVAL O TANKS,
<br />SAN JOACUIN CONT( EMARO•ME NTAL HEALTH DIVISION TANK CLOSURE
<br />GUDELWM AND SOIL AND GROUNDWATER SAMPLING GUIDELINES
<br />SHALL. BE FO.LOUM EXCEPT WERE THE FOLLOWING SPECIFICATIONS
<br />ARE MMOE RESTRCTIVE.
<br />REMON/E ALL PRODUCT FROM TANG$.
<br />REMOVE ALL RESIDUAL LIQUID, GOLDS, OR SLUDGE&
<br />PUbRGME ALL 'VAPORS FROM TANK$ WITH A MINIMUM OF THIRTY (30)
<br />PONDS OF SOLID CARBON DIOXIDE (PRT ICE) FOR EACH 1000 GALLONS
<br />OF TAM CAPAOTY AHD PRESENT SALE$ SLIPS TO INSPECTOR
<br />PELLETIZED DRY CE IS RECOMMENDED. GIP ,ALL OPEN0436 EXCEPT
<br />`VENT PIPE AND ALLOW TWO HOUR MN#WM AND SIX HCWR MAX#AJM FOR
<br />OXYGEN DISPLACEMENT AFTER PUTTING CARBON DIOXIDE INTO THE
<br />TANKS. VDNT PPE OPENING TO RE CHECKED WITH A COMBUSTIBLE GAS
<br />DETECTOR TO DETERMINE F TANK IS VAPOR FREE OR F ADDITIONAL
<br />DRY ICE AND/OR TIME MAY BE REQUIRED.
<br />P7.UG OR CNP ALL TAM OPENINGS, LEAVNG AN VS' - V4' PRESSURE
<br />RELIEF HOLE IN ONE CAP AT THE TOP OF THE TANK.
<br />VISUALLY INSPOCT THE TANKS UPON REMOVAL ALL EXTERNAL TANK
<br />SURFACES AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLES
<br />OR LEAKAGE. THE RESULTS OF SUCH INSPECTION SHALL EE
<br />DOCUMENTED N WITH PWOTOlftAPM6 04M APPROPRIATE.
<br />PATCH ANYHOLES WITH APPROVED MATERIAL BEFORE TRANSPORTING
<br />TANKS TO DISPOSAL SITE.
<br />TWO SOL SAMPLES SHALL BE ANLALY=O FROM BENEATH THE TAMC ONE
<br />FROM DIRECTLY BENEATH THE FILL PIPE. THE OTHER PROM A SIMILAR
<br />POSITION AT THE OPPOSITE END OR THE TAMC F OBVIOUSLY STATED
<br />OR CONTAMINATED AREAS EST N LOCATIONS OTHER THAN THE ABOVE
<br />LOCATIONSTHEN ADDITIONAL SOL SAMPLES SMALL BE ANALYZED FROM
<br />THERE OBAOUOLT STAINED OR CONTAMINATED AREAS.
<br />SOIL SAMPLES SHALL BE COLLECTED FROM THE NATIVE SOL AT OR
<br />JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOL
<br />SAMPLES SHALL BE TALKE4 USING A DRIVEN -TUBE TYPE SAMPLER
<br />CAPPED ANMD SEALED WITH VERT MATERIALS. FORMAL, OIGHW CHAIN -
<br />OF -CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND
<br />SUBMITTED WITH THE RESULTS TO TLE RE50ULATIG AGENCY.
<br />TO EXPEDITE THE PROCESS OF TANK REMOVAL, THE FOLLOW43
<br />ALTERNATIVE SAMPLING METHOD MAY BE USED,
<br />A. MMEDWTELY LPON REM10✓AL. OF THE TARING, A BArGOdOE BUCKET OF
<br />HATNE SOIL SHALL BE TAKEN ARCM THE NATIVE SOIL TWO (2) FEET
<br />BELOW THE SOLADACKFLL MAERRFACE THIS SOL. SHALL BE RAPIDLY
<br />BROUGHT TO THE SURFACE.
<br />8 APPROXIMATELY THREE INCHES SHALL BE RAPIDLY SCRAPED AWAY
<br />FROM THE SURFACE OF T146 SOIL. THEN A CLEAN BRAN TUBE (AT
<br />LEAST I INCURS LONG) SHALL NE pRIVRN INTO THE SOL WITH A
<br />SUITABLE INSTRUMENT (WOODEN MALLET, ETC.).
<br />C. THE ENDS OF BRASS TUBE SHALL BE COVERED WITH ALUMINUM FOIL,
<br />THEN PLASTIC END CAPS. AND FINALLY WRAPPED WITH A SUITABLE
<br />TAPE.
<br />D. THE *AMA $HALL BE IMMEDIATELY PLACED ON kms, OR DRY M
<br />FOR TRANSPORT TO A LABORATORY. AGAIN, FORMAL. GRAN -CP -CUSTODY
<br />SMALL BE MAINTAINED AND SUBMITTED FOR EACH SAIMPL.E.
<br />F THE BOTTOM OF THE TANK S BELOW THE GROUNDWATER TApLE. THEN
<br />SOL SAMPLES APE NOT REGURIED. N THIS CASE, A WATER SAMPLE
<br />SHALL BE COLLECTED AS SOON A6 P066ME FROM TIE SURFACE OF
<br />T}E GROUNDWATER IN THE EXCAVATIO. A CFECK SMALL INITIALLY BE
<br />MADE FOR ANY FREE FLOATING PRODUCT. F NO FLOATING PRODUCT S
<br />THEM A WATER SAMPLE SHALL IE TAKEN WITH A DEVICE
<br />PEOMED TO REDUCE THE LOW OF VOLATILE OCHPONIENT& A BALER
<br />16 A SUITABLE SA1"PLN0 DEVICE. TFE WATER SAMPLE SHALT BE
<br />-
<br />IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL
<br />WITH A6 LITTLE AGITATION AS POSSIBLE A TEFLON SEPTUM SHALL BE
<br />USED TO SEAL TIES VIAL
<br />SOL AND WATER SAMPLES, SMALL 158 ANALYZED FOR TOTAL
<br />BY THE METMODS OUTLINED N % WDELIE6 FOR
<br />ADDIRESONG FUEL LEAKS. CALIFORNIA REGIONAL WATER QUALITY
<br />CONTROL BOAyRD, SAN FP-44CIOW DAY REGION • SEPTEMBER fes.°
<br />LOAD TANKS ON HIGHWAY CARRIER WITH PRESSURE RELIEF MOLE UP OH
<br />SAME DAY AS REMOVAL. U#LESS THE TANG" HAVE BEEN TRIPLE RINSED,
<br />THE C.NRRHER MIST BE A LICENSED WASTE HAULER AND MANIFESTO
<br />MUST ACCOMIF'ANY THE TANKS.
<br />3D REMOVAL OF PIPING
<br />PIPING TO IN MEMMW SHALL iE EMPTIED OF ALL C0MYE M6 PRIOR TO
<br />REMOVAL PIPING SHALL Me STOCKPILED ON-SITE PRIOR TO DISPOSAL
<br />VISUALLY INSPECT PPE TRENCH POR INDICATION OF LEAKAGE. A SOL
<br />SAMPLE SHALL BE TAKEN ANA ANALYZED FOR EACH TURINITY LINEAL
<br />FEET OF TMENCFH IF INSPECTION OF TRENCH REVEALS EVIDENCE OF
<br />LEAKAGE. FOLLOW PROCEDURE LISTED N SECTION 20 FOR &WRI-NG
<br />ANA A 44L.YOW
<br />FLAME
<br />LIQUORS, INC.
<br />1301 W. KETTLEMA N LAME
<br />LM, CA 95242
<br />209-334-3233
<br />AFN 031-040-05 t 06
<br />ALMS
<br />ENOIN83". INC.
<br />PUJ. DOX ID
<br />E143 MiSca LAME
<br />UVBT 8 O, CA 106 -BI
<br />(916) 312 -
<br />PAX 313-In2
<br />DM CR404116
<br />07 #WYt1A AS
<br />FRMIRM O 5N.914 0006§PM W.
<br />xD 0F69111tlM E � POR AM/ FHltlK+N
<br />rnri- 111.tHHWI rit rHW9
<br />OSIMMLipomAmpTPMORIONIS
<br />B6NH. T171'!! COR
<br />UUR7i
<br />RmaaGmotamea H w
<br />Np.
<br />COPYRIGHT 0 1997
<br />►-AAAA.
<br />IL
<br />
|