Laserfiche WebLink
R' . MATBRAAL AND WORKIISAISSUREP <br />L • UNLEN OTHERWISE SPECIFICALLY PROVIDED N THESE DOCUMENTS, ALL <br />ECUFMIENT, MATERIAL, AND ARTICLES INCORPORATED N THE WORK <br />COVERED BY THESE DOCLI19WO ARE TO BE NEW AND OF THE MOST SUITABLE <br />CIPLADE FOR THE PROCESS INTENDED. <br />-. THE CONTRACTOR MALL FURNU5W TO THE OUJINERS AUNT FOR HS <br />APPRbOVAL THE NAME OF THE MAMPACTURER, THE MODEL ALS <br />OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE <br />CAPABILITY, MATURE, AV RATING OF THE MACHINERY AND <br />MECk&WCAL AND OTHER EQUIUNION THE CONTRACTOR CONTEMPLATES <br />INCORPORATING N THE WORK WEN REWIRED BY THE OWERS AGENT <br />3. WHEN p DY THESE DOCUMENTS OR WHEN CALLED FOR BY THE <br />CUM" AGENT THE C4MTRACmTOR SHALL FURNISH THE AGENT FOR <br />APPROVAL RILL WOMMAWON CAPHOEMNIMa THE MATERIAL OR ARTICLES <br />WHICH WE C414TEMPLATES INCORPORATING N THE WORE WHEN 60 <br />DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE <br />CONTRACTOR'S RXIMft, WITH AL1. SHIPPING PREPAID. <br />4. MACHINERY. ECUIPMElTT, MATERIA, AND ARTICLES INSTALLED OR USED <br />WRHOA REMIXED AL- SHALL BE AT THE RISK OF 81 Q.BNT <br />5. ALL WORK TO BE DOE N ACCORDANCE WITH APPLICABLE COOE6 AND <br />REGULATIONS. <br />6. ALL MATERIALS SMALL BE INSTALLED PER MIANLFACNIRER'S INSTRACTIOS <br />AHD THESE DOCUMENTS. CONFLICTS SHALL DE DROUGHT TO THE ATTENTION <br />OF THE ENGINEER. <br />I. F ANY OF THEM DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR <br />LOCAL MISCO A6 ARE CU WA94ILY N EFFECT AT THE TIME OF THIS <br />IT S EXPECTED THAT TGE MOST RESTRICTM.E CONDITIOWS) <br />WOULD APPLY. <br />1. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING <br />CCURM PRIOR TO THE START OF WORK CERTIFICATION OF THIS MUST BE <br />PROVIDED TO THE OUNERS ENGINEER PRIOR TO THE START OF WON . <br />-. CONTRACTOR EMPLOYEES TO HAVE C.ETED THE PIPING M YNP <br />TRAINING REGIUNREMENTS N ACCORDANCE WITH SS4 CALFOR41A LST <br />FINOLLATI" CERTIFICATES SMALL 219 PROVIDED TO OWNER <br />CONTRACTOR SHALL CZMPLETZ THE PIPING INSTALLATION CHECKLIST <br />SUPPLIED PIPING MANUFACTURER AND SMALL FURNISH THE CMCKL16T TO <br />OWER <br />3. CONTRACTOR TO HAVE ISM TRAINED AND CERTPED BY THE TANK <br />MANUFACTUMM N CORRECT TALK INSTALLATION N ACCO DAUNRCE WITH 1954 <br />CALIFORNIA UST MISGULATICNG. CERMICATE6 SHALL BE PROVIDED TO <br />CURER CCNTRACTOR SHALL COMPLETE THE TANK ISTALLATION CHECKLIST <br />SUPPLIED TANK MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO <br />4. CONTRACTOR SHALL HAVE THE FOLLOWING LI <br />A GENERAL EMBINEERING "A' <br />B. MATERIAL SU86TANCE HANDLING ('HAZ") <br />S. OR SHALL HAVE THE FOLLOWING INSURANCE. CCNITRACTOR SHALL. <br />HAVE PROOF O SUCH INSURANCE ON FILE WITH OLDER BY NAMING OWNER <br />AS "ADDITIONAL . <br />A STATUTORY WOR FMAM6 0211PREMEN&VE LIABILITY <br />Ek C421PREMENSIVE GIENERAL LIABILITY. WITH A COMBINED SINGLE <br />LIMIT OF NOT LESS THAN Np00p00 PER OCOuXXBqcv FOR BODILY <br />WUI RY ALND PROPEItTy DAMAGE. <br />G AUrCV40LE LIABILITY COVERING I= OF ALL OUGM HIRED <br />VBHKiES WITH A C42101NED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY <br />OF NOT LEN THAN Mp00APOO PER OCCURRENCE FOR BODILY NAw Am <br />FIROF49RTY DAMAGE. <br />6. GENERA COHTRACTOR TO FLUSH ALL LABOR MATERIAL, Sal"IM, AND <br />SERVICES NECESSARY FOR OR REASONAMY INCIDENTAL TO THE <br />SATISFACTORY CCIMPLETICN OF ALL WORK SHOWN OR CALLED FOR OR <br />REQUIRED BY THE <br />1. ALL WOW SHALL Off PERFORMED N ACCORDANCE WITH THE UNIFORM <br />BUILDING CODE, UNIFORM FIE CODE, NATIONAL ELECTRICAL CODE, <br />CALIFORNIA UNPIRMOMOUND STORAGE TAM MECKLATIONG, OSHA <br />CO GIR CTIOiN SAFETY ORDERG, AND ANY OTHER APPLICABLE STATE, CRY, <br />OR COUNTY ORDINANCES <br />A PETROLJ DEMO PERMTT6 TO BE SECURED BY OWER MSC PERMMS, <br />AS MEAUXISO, SHELL BE SECOND BY CONTRACTOR WHO IS IMOPONSIBLE <br />FOR COMPLYING WITH ALL PERMIT CONDITIONS. <br />'I CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF OF ALL <br />EXISTING CONDITION PRIOR TO 6jS MITTNG HIS ISO. <br />10 GENERAL CONTRACTOR SMALL PIRIOTIECT ALL EXISTING FACILITES TO <br />NOTED OTHERWISE CONTRACTOR SMALL REPAIR OR <br />REPLACE TO i:8 SATISFACTION OF THE ATNE ANY <br />EXIST PACLfrIE6 THAT s BY THE CONTRACTORS <br />IL ALL EXCAVATION* SMALL DE FSWOMW N COMPL.IANGE WITH OSHA AND <br />STATE REGULATION& THE CONTRACTOR 16 TO THE OSHA <br />9D CAVAT ALSO TFRMNC44M OPERATIONS, FOR A SAFE WORK <br />PRACTICES GUM MR PERFORMING EXCAVATION WORK, <br />Q. LP'ON commzrm OF riwacT, CONTRACTOR SHALL PROVIDE OWER WITS <br />-AAS BULL DRAWINGS OF ALL ITEMS (STALLED BY SAME. 'AS BU LTS' <br />SMALL LL ON-SITE WITH INFORMATION NOTED DIRECTLY ON <br />JOB COPY. <br />13. HOT USED <br />W. CONTRACTOR SHALL COORDINATE ALL INSPOCrIONS, AND APPROVALS. <br />B. GOLERMNG CODESAs STANDAR DS INCLUDE, BUT SHALL NOT DE LIMITED <br />TO, THE STANDARDS OF THE FOLLOW <br />NATIONAL STANDARDS INSTITUTE (ANSI) <br />AMERICAN PffTMOLl!UH INSTITUTE (N) <br />SOCIETY FOR TESTING AND MATERIALS (.ASTM) <br />UNIFORM BUILDING CODE (Lac) <br />NATIONAL ELECTRIC CODE (NEC) <br />NATIONAL ION AGENCY (NFPA) <br />UNDERWRITE" LABORATORIES, NO. (IAN <br />CALIFORNIA CODE OF REGULATIONS (CCR) <br />LOCAL ORDHAMM <br />10. SAFETY PLAN, CONTRACTOR SHALL DEVELOP AND HAMAN FOR THE <br />DURATION OF THE CONTRACT A SITE HEALTH t SAFETY PLAN THAT WILL <br />EFFECTIVELY INCORPORATE AV IMPLEMENT REQUIRED SAFETY PROVI610N8, <br />FOR TA KJLIE REMOVAL AND MTAL-LATICN, PRIOR WORK. START, AND, <br />A, APPOINT AN EMPLOYE! AS THE SAFETY OTICER WMO I6 dLALANED <br />AND-WHORZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH TIE <br />HEALTH AND SAFETY PLAN. SUBMIT THE NAME AND QUALFCATIONS OF <br />THE SAFETY OFFICER TO THE OUINERM AGENT PRIOR TO WHORL <br />ON THE SITE. <br />B, THE PLAN SHALT. CONTAIN THE NAMES, ADDRESSES AND TELEPHONE <br />NUMBERS OF THE SUPERV18ORYPERBONNEL. TIE 408MTAL- FACILITIES <br />NEAREST THE SITE, AHD A MAP TO THE WO WTAL PROCEDURES SHALL. BE <br />MPOTTBN N THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS <br />OR WAZARDOUS SUBSTANCES BE UNCOVERED. <br />C, CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH EMPLOYEES AND <br />SUPPLY THE MEETING MIN UTE6 TO OWER WHEN REQLEOTED. <br />D, F DURING THE COURSE O THE UJORK, UNSAFE CONDITION DEVELOP <br />OR APE W11COURTSM110, TAKE IMMEDIATE MEASURES TO CORRECT THE <br />CO1DITICN. F THE C4111IMECTIVE ACTION 16 INSUFFICIENT N THE <br />OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL <br />CCIRRECTNE ACTION CAN BE IMPLEMENTED. <br />E, PRIOVIDS A MNRILM OF TWO FIRE EXTNGUUGHER'S WITH A MINIMUM <br />CLASS RATING OF 2 -A$0 -DNC WITHIN 50 FEET OF THE OPERATION. <br />M. UNDEMSMOUND SERVICE ALERT (USA) - THE CONTRACTOR SHALL NOTIFY <br />OF U.$MA. 2 FILL WORKING DAYS N ADVANCE OF PERFORMING <br />ANY EXCAVATION WORK BY CALLING THE TOLL ONS -CALL PROGRAM <br />NUMBER i SOO) 221-2600. <br />.OMC <br />I. PRS TO THE START OF WORK PROVIDE OONEIR WITH WORK PLAN AND <br />TH4AT ALLOWS THE SITES STORE TO REI`AN OPEN TO THE <br />FULLEST EXTENT POSSIBLE. <br />2. PO4CE OFF WORK ALFA WITH 6' HIGM CHUAN LINK INCE. POST P <br />OUT* SIGNS ON FEPNCE EVERY 30 FEET. AT THE END OF EAON WORK DAY <br />SECURE FENCING PANELS TOGETHEIR <br />3. FLUSH, CO. AND REMOVE PRODUCT LINES FROM EXISTING TANKS TO <br />D ISLANDS. <br />4. REMOVE ALL EXISTING REL DISPONSERS, ISLANDS, BARRICADES, FUEL <br />LIES, ASPHALT AND CONCRETE SURFACES AS REaJIFED, N <br />PREPARATION FOR INSTALLATION OF NEW AS SHOWN ON DRAIJUNW. ANY <br />SALVAGEABLE TO DE FROM SITE AS DIRECTED BY <br />OWNER 9ENTATNE <br />5. WILL CONTRACT WITH AND RSINISH CONSULTANTS TO PERFORM SOL <br />AMD/014! WATER TESTING UPON PIPING REMOVAL IN ACCORDA MCE WITH <br />PIPING REMOVAL. PLAN AND LOCAL REGULATIONS. <br />6. CONTRACTOR SMALL PLACE EXCAVATED SOIL ON, AND SMALL COVER WITH, <br />4 ML. PLASTIC UNTIL SOL HS REMOVED, MOVED, ANY SOL TO BE STOCKPILED ON <br />SITE FOR SAMPLING PRIOR TO OP -HAUL BY OTHERS AS DIRECTED BY <br />OWER <br />I. OWER &,ALL PROV06 FOR TRANSPORTATION'. AND DISPOSAL. OF ALL <br />EXCAVATED SOIL AFTER COMPLETION OF ANY NECESSARY RE EDIATICK <br />INCLUDING AERATION <br />8. F REGI UIRED FOR ABANDONSIP EXCAVATION, BACKFILL ONCE ALL SAMPLING <br />AND/OR OVER -EXCAVATION 16 COMPLETED. BACKFILL MIST BE ENGINEERED <br />FILL COMPACTED TO W%. THE CONTRACTOR N RESPONSIBLE FOR <br />CERTIFYING THE COMPACTION, <br />S EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW EQUIPMENT. <br />D. INSTALL "TYPAW RFLTEFt PAM= LINER N PIPING TRENCHES, PER <br />BY SITE CONDITIONS. <br />IL INSTALL EOL P EHT AS LISTED IN OUNEWS EdUPME MT LIST INCLUDING <br />SAL 1AGEABLE ISGUIPMENT TO BE REINSTALLED F ANY. AND PROVIDE ANA <br />INSTALL ALL OTHER EGIUIPHIINT A0 REQUIRED TO PROVIDE A OCIlIPLIETE <br />PETROLEUM SYSTEM <br />12 PROVIDE AND INSTALL NEW PRODUCT 1,1eM, VAPOR AND SECONDARY <br />CONTAINMENT LIES PER OMAUMM CURRENT <br />INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND *HALL NAVE <br />PWECED9NCE OVER OTHER INSTRUCTIONS. MANUFACTUREPM CHECKLISTS <br />SMALL DE BY THE CONTRACTOR A$ EACH STEP 16 COMPLEMD <br />A, PRODUCT PIPIN& 2- PRIMARY PIPING WITH 3' CONTAH HENT <br />SYSTEM A6 AF14IDvW BY OWNER. ALL PIPING AND CONTAINMENT SYSTEMS <br />SMALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT SYSTEM SHALL <br />BE RST T1E SAME MANUFACnIRER WITH THE SAME SEFM ADHESIVES <br />AMD/OR FITTINGS. <br />9% VENT/VA PPI W RED THREAD IIA ANA RED THREAD 11 WITH <br />FITTINGS, AND 1000 AND SOW SERIES ADHESIVE, OR AM'EiRO N DUTALOY <br />300M WITH ALCOHOL FITTIN&SAND RP40 ADWANX DO NOT MDC <br />MANN MATERIALS, <br />G PERSONS INSTALLING PIPING MIST BE CERTIFIED AS, HLAVI M BEEN <br />TRAINED BY I'IANUPACTUMM <br />D, STEL PPE, ALL METAL PIPING SMALL BE BLACK INTI <br />40, OR 911MA STRONG. GAL'/AN= MPE IS NOT ALLOWED. NTTNG$ <br />SHALL BE 300 FW MALLEABLE IRON. <br />E, ALL STEEL PIPE DELCW GRACE 16 TO BE DOUBLE WRAPPED WITH 20 <br />MIL. Ps_' PIPE WRAP, OVER A PIPE WMAP FOR USE WITH VINYL <br />TAPES, AND SHALL BE BY TIE SAME MANUFACTURER As THE Wt AP <br />R ALL THREADED CONECT SHALL WITH NALAHT <br />WHICH $HALLO BE CURRENTLY UARRWW BY tt*WACPJMR MR FILL <br />ATIBLITY WITH THE MPNG MATERIAL USED, AND FOR LINE WITH <br />PETROLEUM SOLVENTS, BELS, OL$, POOL, AND 100% METHANOL, WHICH <br />SMALL BE ASIRIFIED DT CURRENT MANUFACTURIEW6 PRODUCT DATA BEET. <br />G: GNC, SHALL DEMONSTRATE TOREPRESENTATIVE THAT ALL <br />MATERIALS AM NEW AND CONFORM TO ABOVE SPECIFICATIONS, <br />13. DO NOT PLACE PIRA PIPING UNDER ]BUILDINGS. PIPING RM OvER <br />TAMKb SMALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS SHOWN ON <br />.141 Mi OTHER LINES APA CONEXUT. P PIPING <br />16 NOT SHOWN ON HTE PLAN, GUC. SHALL RUN LIMES THE M06T DIRECT <br />RCUM SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. <br />14. PIPl,* SYSTEMS SMALL BE TESTED PER CURRENT MANUFACTURE]" <br />INSTRUCTIONS $:41LL BE FOLLOWED AT ALL TIMES. AND SHALL HAVE <br />PRECEDENCE OVER OTHER INSTRUCTIONS, <br />A, GC. TO NOTIFY 0"" SENTATIVE TWO WORKING DAY$ PRIOR <br />TO LINE TESTING, OWNER'S PEPREWNTATIVE $HALL WITNESS ALL LINE <br />TESTING. MARC TESTPRESSURES ON GAUGE WITH ELECTRICAL TAPE AT <br />BEGINNING OF TESTS, PRESSURE SHALL HOLD FOR AT LEAST OE (1) <br />HOAR APD BE WITNESSED BY CUM" IEP{RESIENNTATNE. DO NOT BACKFILL <br />UNTIL AUTHORIZED BY OWER•6 REPRESENTATIVE. <br />B, TEST PRE6 SHALL BE, <br />" - S0 PSI AHD APPLY SOAP SOLUTION. <br />3' - 40 PN AND APPLY SOAP SOLUTION. <br />3' - SECONDARY - 5 PN AND APPI.Y SOAP SOLUTION. <br />C. CAUTION, DISCONNECT FLEX COIECTOR FROM STP AND CAP PRIOR <br />TO T'$STW- APPLY 1 RELEASE PRESSURE SLOWLY. VENTNAPHOJR SYSTEM <br />SMALL BE TESTED FROM TOP OF `BJT, THROUGH MANFOLOM EXTRACTOR <br />DAGRAND MISER STA GE I CONTAINMENT MANNOL.E6, STAG! it 'VAPOR <br />LIES TO ISLANDS AND STAGE II FLEX CONNECTORS AT D S). <br />D. SLOWLY PRESSURIZE PRODUCT LINES AND VENTNAPOR SYSTEM TO 50 <br />N <br />P. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS AID FITTINGS, <br />CORRECT ANY LEAKS AND RETEST. <br />E. SLOWLY RELEVE PRESSURE FROM VAPOR/v%M SYSTEM AND REMOVE <br />PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LIME <br />PRESSURE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVING I$ <br />COMPLETE. <br />F. SECONDARY PIPE MUST DE PROPERLY CUNT. INSECT ALL PRIMARY <br />PIPE SURFACES. PRENUIZE SECONDARY PIPE TO 5 PSI AND SOAP ALL <br />MR°! SURFACE AND FITTINGS. PRESSURE ON THE PIPING SECONDARY <br />SPACE SMALL BE MAINTAINED UNTIL AFTER THE PAVING S N PLACE OVER <br />TAW FIELD AND PIPIG RUNS, AID SMALL Be WITNESSED BY THE <br />REPIRESENTAMR. <br />G. AFTER BEING WTNE$SED BY OWER°$ REPRESENTATIVE, REMO'vE <br />PRESSURE FROM PRODUCT LIES AND AIR FROM SECONDARY LIES AFTER <br />PAVING S N PLACE <br />D. GNC. $HALL PERFORM PRECISION TEST GN PRODUCT LINES AFTER PAVING <br />IS AND PRIOR TO FINAL PROJECT ACCEPTANCE. PIRECISION <br />LINE TEST SHALL DE N ACCORDANCE WITH NHPA 329, LOCAL <br />OR APPROVED EQUAL. TEST SHALL DE CONDUCTED BY A <br />CERTIFIED TROTIM GNC. SHALL PROVIDE WRITTEN REPORT OF PIEC161O1 <br />TEST TO OWERR`S REPRESENTATIVE PRIOR TO CUM" ACCEPTANCE OF <br />PROMCT. <br />S. CONTRACTOR SMALL PROVIDE DOCUMENTATION O A DYNAMO SACKPIRIESSURE <br />?EST OF ALL VAPOR RETURN LIES A$ IEGWRED BY LOCAL REGULATIONS, <br />n. CONTRACTOR SHALL DO ANY OTHER TESTING AS REWIRED BY LOCAL <br />MISMILATtONS, <br />18 CONSTRUCT NEW REL NLANDS A$ SHOO ON DRAWINGS. <br />19. BRAVO BOXES TURIMME SUMPS AND OVERFILL ]BOXES APE TO BE <br />COMPLETELY SEALED ANMD WATER TESTED, AS EVIDENCED BY ODUIER'6 <br />REPRESENTATIVE AS FCLLCW 16 <br />L RLL WITH WATER TO HIGHEST PENETRATION. <br />2 SPRAY PAINT TOP OF WATER <br />20. PROVIDE AM INSTALL CC DUIT U WPMG FOR PETROLEUM STSTEM1(6). <br />PROVIDE CO PW FOR FUTURE CARDIREADEft ATD 0 1' ,CIX SITE <br />ELECTRICAL AS INDICATED ON THE DRAUW1,106. <br />2L INSTALL MONITORING SYSTEM WITH INTERSTITIAL PROWS, TURBINE SUMP <br />AAD TANK GAUGES, AND MONITOR CONTROL PANEL N BULDM <br />PER DIRAWINGS, <br />22. INSTALL NEW DISPENSERS. ANA CONTROL EGIRIPMEMT <br />AS INDICATED ON SITE PLAN AND DESCRIBED, IN THE 114UPMONT LIST. <br />23. #STALL. GBL C40NCREM TANK AND DRIVE SLABS, AND OTHER CONCRETE AS <br />'RED ON SITE PLA -L CONCRETE 09ALL HAVE A MINIMUM <br />STRENGTH AT 29 DAYS OF 2500 PSI. <br />24 REPAIR AND/OR REPLACE AC. PAVING AND BASE TO MATCH ORIGINAL N <br />AREAS DISTURBED BY WORK <br />28. AM 84VIRONMENTAL WORK REWIRED OUTSIDE THE ABOVE SCOPE OF WOW <br />SMALL BE DONE ON A THE ANO MATERIAL$ DABS. RENAL RECEPM, <br />SUISCONI'MACron #NOtClt! MATERIAL RECEIPTS, AND DAILY LABOR TIME <br />SHEETS SHALL BE REG%IRED TO SUPPORT 41914111RAL CONTRACTOR TIME AND <br />MATERIAL M/DICE& SUCH WORK SHALL BE BILLED SEPARATELY. <br />2D CLOSURE PROCEDURE -REMOVAL O TANKS, <br />SAN JOACUIN CONT( EMARO•ME NTAL HEALTH DIVISION TANK CLOSURE <br />GUDELWM AND SOIL AND GROUNDWATER SAMPLING GUIDELINES <br />SHALL. BE FO.LOUM EXCEPT WERE THE FOLLOWING SPECIFICATIONS <br />ARE MMOE RESTRCTIVE. <br />REMON/E ALL PRODUCT FROM TANG$. <br />REMOVE ALL RESIDUAL LIQUID, GOLDS, OR SLUDGE& <br />PUbRGME ALL 'VAPORS FROM TANK$ WITH A MINIMUM OF THIRTY (30) <br />PONDS OF SOLID CARBON DIOXIDE (PRT ICE) FOR EACH 1000 GALLONS <br />OF TAM CAPAOTY AHD PRESENT SALE$ SLIPS TO INSPECTOR <br />PELLETIZED DRY CE IS RECOMMENDED. GIP ,ALL OPEN0436 EXCEPT <br />`VENT PIPE AND ALLOW TWO HOUR MN#WM AND SIX HCWR MAX#AJM FOR <br />OXYGEN DISPLACEMENT AFTER PUTTING CARBON DIOXIDE INTO THE <br />TANKS. VDNT PPE OPENING TO RE CHECKED WITH A COMBUSTIBLE GAS <br />DETECTOR TO DETERMINE F TANK IS VAPOR FREE OR F ADDITIONAL <br />DRY ICE AND/OR TIME MAY BE REQUIRED. <br />P7.UG OR CNP ALL TAM OPENINGS, LEAVNG AN VS' - V4' PRESSURE <br />RELIEF HOLE IN ONE CAP AT THE TOP OF THE TANK. <br />VISUALLY INSPOCT THE TANKS UPON REMOVAL ALL EXTERNAL TANK <br />SURFACES AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLES <br />OR LEAKAGE. THE RESULTS OF SUCH INSPECTION SHALL EE <br />DOCUMENTED N WITH PWOTOlftAPM6 04M APPROPRIATE. <br />PATCH ANYHOLES WITH APPROVED MATERIAL BEFORE TRANSPORTING <br />TANKS TO DISPOSAL SITE. <br />TWO SOL SAMPLES SHALL BE ANLALY=O FROM BENEATH THE TAMC ONE <br />FROM DIRECTLY BENEATH THE FILL PIPE. THE OTHER PROM A SIMILAR <br />POSITION AT THE OPPOSITE END OR THE TAMC F OBVIOUSLY STATED <br />OR CONTAMINATED AREAS EST N LOCATIONS OTHER THAN THE ABOVE <br />LOCATIONSTHEN ADDITIONAL SOL SAMPLES SMALL BE ANALYZED FROM <br />THERE OBAOUOLT STAINED OR CONTAMINATED AREAS. <br />SOIL SAMPLES SHALL BE COLLECTED FROM THE NATIVE SOL AT OR <br />JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOL <br />SAMPLES SHALL BE TALKE4 USING A DRIVEN -TUBE TYPE SAMPLER <br />CAPPED ANMD SEALED WITH VERT MATERIALS. FORMAL, OIGHW CHAIN - <br />OF -CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND <br />SUBMITTED WITH THE RESULTS TO TLE RE50ULATIG AGENCY. <br />TO EXPEDITE THE PROCESS OF TANK REMOVAL, THE FOLLOW43 <br />ALTERNATIVE SAMPLING METHOD MAY BE USED, <br />A. MMEDWTELY LPON REM10✓AL. OF THE TARING, A BArGOdOE BUCKET OF <br />HATNE SOIL SHALL BE TAKEN ARCM THE NATIVE SOIL TWO (2) FEET <br />BELOW THE SOLADACKFLL MAERRFACE THIS SOL. SHALL BE RAPIDLY <br />BROUGHT TO THE SURFACE. <br />8 APPROXIMATELY THREE INCHES SHALL BE RAPIDLY SCRAPED AWAY <br />FROM THE SURFACE OF T146 SOIL. THEN A CLEAN BRAN TUBE (AT <br />LEAST I INCURS LONG) SHALL NE pRIVRN INTO THE SOL WITH A <br />SUITABLE INSTRUMENT (WOODEN MALLET, ETC.). <br />C. THE ENDS OF BRASS TUBE SHALL BE COVERED WITH ALUMINUM FOIL, <br />THEN PLASTIC END CAPS. AND FINALLY WRAPPED WITH A SUITABLE <br />TAPE. <br />D. THE *AMA $HALL BE IMMEDIATELY PLACED ON kms, OR DRY M <br />FOR TRANSPORT TO A LABORATORY. AGAIN, FORMAL. GRAN -CP -CUSTODY <br />SMALL BE MAINTAINED AND SUBMITTED FOR EACH SAIMPL.E. <br />F THE BOTTOM OF THE TANK S BELOW THE GROUNDWATER TApLE. THEN <br />SOL SAMPLES APE NOT REGURIED. N THIS CASE, A WATER SAMPLE <br />SHALL BE COLLECTED AS SOON A6 P066ME FROM TIE SURFACE OF <br />T}E GROUNDWATER IN THE EXCAVATIO. A CFECK SMALL INITIALLY BE <br />MADE FOR ANY FREE FLOATING PRODUCT. F NO FLOATING PRODUCT S <br />THEM A WATER SAMPLE SHALL IE TAKEN WITH A DEVICE <br />PEOMED TO REDUCE THE LOW OF VOLATILE OCHPONIENT& A BALER <br />16 A SUITABLE SA1"PLN0 DEVICE. TFE WATER SAMPLE SHALT BE <br />- <br />IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL <br />WITH A6 LITTLE AGITATION AS POSSIBLE A TEFLON SEPTUM SHALL BE <br />USED TO SEAL TIES VIAL <br />SOL AND WATER SAMPLES, SMALL 158 ANALYZED FOR TOTAL <br />BY THE METMODS OUTLINED N % WDELIE6 FOR <br />ADDIRESONG FUEL LEAKS. CALIFORNIA REGIONAL WATER QUALITY <br />CONTROL BOAyRD, SAN FP-44CIOW DAY REGION • SEPTEMBER fes.° <br />LOAD TANKS ON HIGHWAY CARRIER WITH PRESSURE RELIEF MOLE UP OH <br />SAME DAY AS REMOVAL. U#LESS THE TANG" HAVE BEEN TRIPLE RINSED, <br />THE C.NRRHER MIST BE A LICENSED WASTE HAULER AND MANIFESTO <br />MUST ACCOMIF'ANY THE TANKS. <br />3D REMOVAL OF PIPING <br />PIPING TO IN MEMMW SHALL iE EMPTIED OF ALL C0MYE M6 PRIOR TO <br />REMOVAL PIPING SHALL Me STOCKPILED ON-SITE PRIOR TO DISPOSAL <br />VISUALLY INSPECT PPE TRENCH POR INDICATION OF LEAKAGE. A SOL <br />SAMPLE SHALL BE TAKEN ANA ANALYZED FOR EACH TURINITY LINEAL <br />FEET OF TMENCFH IF INSPECTION OF TRENCH REVEALS EVIDENCE OF <br />LEAKAGE. FOLLOW PROCEDURE LISTED N SECTION 20 FOR &WRI-NG <br />ANA A 44L.YOW <br />FLAME <br />LIQUORS, INC. <br />1301 W. KETTLEMA N LAME <br />LM, CA 95242 <br />209-334-3233 <br />AFN 031-040-05 t 06 <br />ALMS <br />ENOIN83". INC. <br />PUJ. DOX ID <br />E143 MiSca LAME <br />UVBT 8 O, CA 106 -BI <br />(916) 312 - <br />PAX 313-In2 <br />DM CR404116 <br />07 #WYt1A AS <br />FRMIRM O 5N.914 0006§PM W. <br />xD 0F69111tlM E � POR AM/ FHltlK+N <br />rnri- 111.tHHWI rit rHW9 <br />OSIMMLipomAmpTPMORIONIS <br />B6NH. T171'!! COR <br />UUR7i <br />RmaaGmotamea H w <br />Np. <br />COPYRIGHT 0 1997 <br />►-AAAA. <br />YALG SON, TROTOO POUT <br />10 GENERAL RFORMAATION <br />U LOCATION OF TANGS, <br />FLAME LION , INC. <br />IL <br />W KETR.EMAN LH <br />LODL CA 98240 <br />1209) 334-3233 <br />12 OJI,ER, <br />PETE GRAMIGNA, <br />1301 W KETTLEMAN LN. <br />LOCI, CA 0240 <br />( 209) 334-3233 <br />13 PICT START <br />16 FEB 96 <br />1,/ TO Be REMOvvtD, <br />3 61L U$Te G k7A0O GALS. <br />M CONTRACTOR, <br />WAL.TON ENGINEERING, INC. <br />GEOLOGIST, <br />GRAYLAND ENVIRONMENTAL - <br />2131 QUAL. ST. <br />OAVI6, CA 98616 <br />JEFF CLAYTON (916) 186-1.141 <br />LABORATORY, <br />CLS (STATE CERT. 1233) <br />3083 GOLD CARNAL DRIVE <br />RANCHO CORDOVAA, CA 95610 <br />(916) 639-1301 <br />2D CLOSURE PROCEDURE -REMOVAL O TANKS, <br />SAN JOACUIN CONT( EMARO•ME NTAL HEALTH DIVISION TANK CLOSURE <br />GUDELWM AND SOIL AND GROUNDWATER SAMPLING GUIDELINES <br />SHALL. BE FO.LOUM EXCEPT WERE THE FOLLOWING SPECIFICATIONS <br />ARE MMOE RESTRCTIVE. <br />REMON/E ALL PRODUCT FROM TANG$. <br />REMOVE ALL RESIDUAL LIQUID, GOLDS, OR SLUDGE& <br />PUbRGME ALL 'VAPORS FROM TANK$ WITH A MINIMUM OF THIRTY (30) <br />PONDS OF SOLID CARBON DIOXIDE (PRT ICE) FOR EACH 1000 GALLONS <br />OF TAM CAPAOTY AHD PRESENT SALE$ SLIPS TO INSPECTOR <br />PELLETIZED DRY CE IS RECOMMENDED. GIP ,ALL OPEN0436 EXCEPT <br />`VENT PIPE AND ALLOW TWO HOUR MN#WM AND SIX HCWR MAX#AJM FOR <br />OXYGEN DISPLACEMENT AFTER PUTTING CARBON DIOXIDE INTO THE <br />TANKS. VDNT PPE OPENING TO RE CHECKED WITH A COMBUSTIBLE GAS <br />DETECTOR TO DETERMINE F TANK IS VAPOR FREE OR F ADDITIONAL <br />DRY ICE AND/OR TIME MAY BE REQUIRED. <br />P7.UG OR CNP ALL TAM OPENINGS, LEAVNG AN VS' - V4' PRESSURE <br />RELIEF HOLE IN ONE CAP AT THE TOP OF THE TANK. <br />VISUALLY INSPOCT THE TANKS UPON REMOVAL ALL EXTERNAL TANK <br />SURFACES AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLES <br />OR LEAKAGE. THE RESULTS OF SUCH INSPECTION SHALL EE <br />DOCUMENTED N WITH PWOTOlftAPM6 04M APPROPRIATE. <br />PATCH ANYHOLES WITH APPROVED MATERIAL BEFORE TRANSPORTING <br />TANKS TO DISPOSAL SITE. <br />TWO SOL SAMPLES SHALL BE ANLALY=O FROM BENEATH THE TAMC ONE <br />FROM DIRECTLY BENEATH THE FILL PIPE. THE OTHER PROM A SIMILAR <br />POSITION AT THE OPPOSITE END OR THE TAMC F OBVIOUSLY STATED <br />OR CONTAMINATED AREAS EST N LOCATIONS OTHER THAN THE ABOVE <br />LOCATIONSTHEN ADDITIONAL SOL SAMPLES SMALL BE ANALYZED FROM <br />THERE OBAOUOLT STAINED OR CONTAMINATED AREAS. <br />SOIL SAMPLES SHALL BE COLLECTED FROM THE NATIVE SOL AT OR <br />JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOL <br />SAMPLES SHALL BE TALKE4 USING A DRIVEN -TUBE TYPE SAMPLER <br />CAPPED ANMD SEALED WITH VERT MATERIALS. FORMAL, OIGHW CHAIN - <br />OF -CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND <br />SUBMITTED WITH THE RESULTS TO TLE RE50ULATIG AGENCY. <br />TO EXPEDITE THE PROCESS OF TANK REMOVAL, THE FOLLOW43 <br />ALTERNATIVE SAMPLING METHOD MAY BE USED, <br />A. MMEDWTELY LPON REM10✓AL. OF THE TARING, A BArGOdOE BUCKET OF <br />HATNE SOIL SHALL BE TAKEN ARCM THE NATIVE SOIL TWO (2) FEET <br />BELOW THE SOLADACKFLL MAERRFACE THIS SOL. SHALL BE RAPIDLY <br />BROUGHT TO THE SURFACE. <br />8 APPROXIMATELY THREE INCHES SHALL BE RAPIDLY SCRAPED AWAY <br />FROM THE SURFACE OF T146 SOIL. THEN A CLEAN BRAN TUBE (AT <br />LEAST I INCURS LONG) SHALL NE pRIVRN INTO THE SOL WITH A <br />SUITABLE INSTRUMENT (WOODEN MALLET, ETC.). <br />C. THE ENDS OF BRASS TUBE SHALL BE COVERED WITH ALUMINUM FOIL, <br />THEN PLASTIC END CAPS. AND FINALLY WRAPPED WITH A SUITABLE <br />TAPE. <br />D. THE *AMA $HALL BE IMMEDIATELY PLACED ON kms, OR DRY M <br />FOR TRANSPORT TO A LABORATORY. AGAIN, FORMAL. GRAN -CP -CUSTODY <br />SMALL BE MAINTAINED AND SUBMITTED FOR EACH SAIMPL.E. <br />F THE BOTTOM OF THE TANK S BELOW THE GROUNDWATER TApLE. THEN <br />SOL SAMPLES APE NOT REGURIED. N THIS CASE, A WATER SAMPLE <br />SHALL BE COLLECTED AS SOON A6 P066ME FROM TIE SURFACE OF <br />T}E GROUNDWATER IN THE EXCAVATIO. A CFECK SMALL INITIALLY BE <br />MADE FOR ANY FREE FLOATING PRODUCT. F NO FLOATING PRODUCT S <br />THEM A WATER SAMPLE SHALL IE TAKEN WITH A DEVICE <br />PEOMED TO REDUCE THE LOW OF VOLATILE OCHPONIENT& A BALER <br />16 A SUITABLE SA1"PLN0 DEVICE. TFE WATER SAMPLE SHALT BE <br />- <br />IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL <br />WITH A6 LITTLE AGITATION AS POSSIBLE A TEFLON SEPTUM SHALL BE <br />USED TO SEAL TIES VIAL <br />SOL AND WATER SAMPLES, SMALL 158 ANALYZED FOR TOTAL <br />BY THE METMODS OUTLINED N % WDELIE6 FOR <br />ADDIRESONG FUEL LEAKS. CALIFORNIA REGIONAL WATER QUALITY <br />CONTROL BOAyRD, SAN FP-44CIOW DAY REGION • SEPTEMBER fes.° <br />LOAD TANKS ON HIGHWAY CARRIER WITH PRESSURE RELIEF MOLE UP OH <br />SAME DAY AS REMOVAL. U#LESS THE TANG" HAVE BEEN TRIPLE RINSED, <br />THE C.NRRHER MIST BE A LICENSED WASTE HAULER AND MANIFESTO <br />MUST ACCOMIF'ANY THE TANKS. <br />3D REMOVAL OF PIPING <br />PIPING TO IN MEMMW SHALL iE EMPTIED OF ALL C0MYE M6 PRIOR TO <br />REMOVAL PIPING SHALL Me STOCKPILED ON-SITE PRIOR TO DISPOSAL <br />VISUALLY INSPECT PPE TRENCH POR INDICATION OF LEAKAGE. A SOL <br />SAMPLE SHALL BE TAKEN ANA ANALYZED FOR EACH TURINITY LINEAL <br />FEET OF TMENCFH IF INSPECTION OF TRENCH REVEALS EVIDENCE OF <br />LEAKAGE. FOLLOW PROCEDURE LISTED N SECTION 20 FOR &WRI-NG <br />ANA A 44L.YOW <br />FLAME <br />LIQUORS, INC. <br />1301 W. KETTLEMA N LAME <br />LM, CA 95242 <br />209-334-3233 <br />AFN 031-040-05 t 06 <br />ALMS <br />ENOIN83". INC. <br />PUJ. DOX ID <br />E143 MiSca LAME <br />UVBT 8 O, CA 106 -BI <br />(916) 312 - <br />PAX 313-In2 <br />DM CR404116 <br />07 #WYt1A AS <br />FRMIRM O 5N.914 0006§PM W. <br />xD 0F69111tlM E � POR AM/ FHltlK+N <br />rnri- 111.tHHWI rit rHW9 <br />OSIMMLipomAmpTPMORIONIS <br />B6NH. T171'!! COR <br />UUR7i <br />RmaaGmotamea H w <br />Np. <br />COPYRIGHT 0 1997 <br />►-AAAA. <br />IL <br />