Laserfiche WebLink
U" PS <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD 3 <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B :� 40 <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT �5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> e <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> 1. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.0.X i, , e. B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) 147 D. TANK CAPACITY IN GALLONS: d <br /> II.TANK NTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ la,-UNLEADEDRLAR ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM F7 80 EMPTY PRODUCT lb PREMIUM ❑ 4 GASAHOL � 7 METHANOL <br /> UNLEADED ❑ 5 JET FUEL <br /> a 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM 0. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.x <br /> 111. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED F72 ALKYD LINING 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING 95 UNKNOWN 99 OTHER <br /> C.INTERIOR F75 GLASS LINING ❑ 6 UNLINED ❑ <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING 7-1 -VINYL WRAP F74 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH p('95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A& 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING3 INTERSTITIAL <br /> MONITORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ i VISUAL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ;D"6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> Vi.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> S UBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME <br /> (PRINTED d SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY,* TANK# <br /> STATE I.D.# �-� 3 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE G--f_ <br /> FORM 8 (7.91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED{.. <br /> /1 FOR003t" <br />