Laserfiche WebLink
SWRCB, January 2002 Page of <br />6_ PIPIN(_ Ci1MP TFfiT1VC_ <br />Test Method Developed By: L Sump Manufacturer ❑Industry Standard rofessional Engineer <br />D Other (Sped) <br />Test Method Used: ❑ Pressure E Vacuum , Hydrostatic <br />❑ Other (Sped) <br />Test Equipment Used: re-, ljto-et 1"« 19 Ja,A J"le oy <br />Equipment Resolution: , 000 j <br />Sump # <br />Sump # Z <br />Sump # <br />%Sump # <br />Sump Diameter: <br />a' <br />421, <br />q� e t <br />Sump Depth: <br />7' <br />Sump Material: <br />e r ,p S S <br />r1 <br />4- 5 <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />I,(; :)-At+ <br />'" v a <, c <br />I ��,1 <br />I W I?" pdo 4,r - f_ <br />14" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />! r' <br />l g jZ r <br />1 r <br />Condition of sump prior to testing: <br />y <br />,p r I <br />V.- Ly <br />s <br />Portion of Sump Tested' <br />Caret $ � � b j <br />WGc �� � � (�' <br />Wct Fri Lsa^F ;L t <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Yes ❑ No ❑ NA <br />'Yes ❑ No ❑ NA <br />QVes ❑ No ❑ NA <br />r <br />❑ Y$s ❑ ❑ NA <br />Turbine shutdown response time <br />nod4-o" r �L-a& <br />^,j f -&A' ('v -Z <br />r <br />Is system programmed for fail-safe <br />® <br />shutdown? <br />F-Yes ❑ No ❑ NA <br />, Yes ❑ No ❑ NA <br />Yes El [INA <br />[IY ❑INo ❑ NA <br />Was fail-safe verified to be <br />at <br />o erional?' <br />❑ Yes o 11 NA <br />❑ Yes ,�lo F-1NA <br />El Yes �No ❑ NA <br />❑ Yes ?No ❑ NA <br />Wait time between applying <br />pressure/vacuum/ er d starting <br />test: <br />I <br />OJ r-v,�.,p-� rx <br />PU r®, Ntt,� <br />Test Start Time: <br />' Z �- <br />U <br />2 . <br />Initial Reading (Ri): <br />Cie. <br />orbs <br />Test End Time: <br />Final Reading (RF): <br />�d% S7a Gr,�G <br />i vi ; <br />Test Duration: <br />3Q i"► , s tt u l <br />3 [? r �t a s �.. r5 <br />,fid i t �.a a ' �S <br />`t <br />Change in Reading (RF -R,): <br />til e) P. !d ,t,, ., <br />�0 C , -...._ f <br />,,rr C <br />Pass/Fail Threshold or Criteria: <br />ne) g .30 Pt; q � � � <br />, e�� � �y�ya�,��� ..,� a <br />.� � � -/TIP <br />Test Result: <br />,amass ❑ Fail <br />ass ❑ Fail <br />ass ❑ Fail <br />❑ Pass Fail <br />Was sensor removed for testing? <br />Yes ❑ No ❑ NA <br />es ❑ No ❑ NA <br />T_es ❑ No ❑ NA <br />❑ Yes ❑ NoH�NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />Yes ❑ No ❑ NA <br />es ❑ No ❑ NA <br />es ❑ No I NA <br />❑ Yes F-1No <br />Comments — (include information on repairs made prior to t( sting, and recommended follow-up for failed tests) <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to ?Mi of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />