Laserfiche WebLink
SEP 22 '97 05:52PM MARLEYW INTI 9138310207 P-9-/10 <br /> r <br /> a <br /> IQUJACKC I <br /> INSTALLATION INSTRUCTIONS <br /> FXV LEAK DETECTORS <br /> FX1V Part No. 116-056-5,FX2V Part No. 116-057-5 <br /> FX1DV Part No. 116-058-5,MIN Part No. 116-059-5 <br /> T11-414A irV dcfawl ttow me w-d ch--nuc this et—to a;ee suanmm to u e w.•rh.=*Z.n k k ru.or w:".v am m.;m m�mwndne ac tiry or the <br /> odiauee unr�+eat <br /> of s harard whish will taws anvn ua>otud jjq W!,, a ,adicate,pry�na uC�h t=ud vhidt a i(i a avn ea�rcnvadT oaraaea7 <br /> doth ar stebae+nud>++�P7 daetace i[ignated. itywy,death yr suhat tatial tKooct b damage if it�tveed. <br /> :ndiato. atahaaatd-h"heo"=W..sitsonvem!imury. , indiatntvaetalattauctiom�amw3,tiea+ .�rcati.n orma�n{�ee <br /> death tet aututsntia!Ol.peftr dnmaco if ipw.td, nanar which era imp.tsaet fist Aot rtlated to Oerre"a1 itgjuq hatardo. <br /> M:C-SEM Before installing lank detector,rgviewthe application section in leak detectormanual rslgl forlimitations; <br /> Or restrictions on usaga. <br /> • This instruction sheet should be kept with the end user of the leak detector for reference. <br /> When using 117-182 Big-Flo Diaphragm Valve,refer to installation instructions 0041-996 included.with the <br /> valve• When using an FXV model leak detector with adapter housing #038-M-5, refer to installation <br /> instructions#041.415-1 included with the housing.FXV Leak Detectors are for use with all UL-Listed 4-inch <br /> Red Jacket models containing a"P"or"AG"prefix:FE Petro UL-Listed 4-inch"STP"models;Tokheim LTL_ <br /> Listed 4-inch models—585A-3d and 585A.150. <br /> EmTampering with the screws or seals on this leak detector may inhibit operation And will void warranty. <br /> This Red Jacket leak detector is to be installed into the two- 2. Remove the two-inch plug from the top of the Red <br /> inch threaded Lapping on top of the Red Jacket submersible Jacket pump. If the two-inch plug is found to be so <br /> pump_The FXDV modelo are specially designed for use with tight that it cannot be removed, the submersible <br /> diesel fuel and should be used in diesel applications to provide should be removed from the tank and placed in a vise. <br /> the appropriate operating characteristics.For proper installa- Remove the functional element assembly next to the <br /> tion,the following steps should be followed in sequence. pipe plug. The plug should then come outreadily if <br /> elarge pipe wrench is used. Replace functional ele- <br /> wire submersible pumps to run ment assembly securely and replace the pump in the <br /> continuously.Red Jacket line leak detec- tank.(See Step 3 before replacing pump). <br /> torswiilnot perform leak testsonpumping :3, Examine straight bore below two-inch thread for <br /> systems that run continuously. corrosion roughness. If found to be rough, smooth <br /> e ieq with fine emery paper. <br /> ALL AIR MUST BE OUT OF THE SYSTEM 4. Apply UL-classified non-toxic pipe thread sealant to <br /> FOR TRE I-EAR DETECTOR TO WORK the two-inch threads on the detector. Lubricate <br /> PROPERLY.Before installingleakdatec. O-ring on the leak detector_ <br /> for in the pump, fill the system with 5. Screw the leak detector into the pump. Tighten with <br /> Product by running the pump and deliv. a wrench(top hex is 1.1/4 in.). <br /> ering product from each dispenser S. Installation of vent tube and sna to connectors. <br /> (starting with the farthest from the pump For FXZV Models p p <br /> and working to the pump)until all air is <br /> removed from system. a. Remove 1/4-inch pipe plug from tank test <br /> port in the Packer(on 6-inch Big-Flo applica- <br /> Certuin regulatory bodies require that leak detectors retrain tions,remove the 1/4-inch pipe plug from the <br /> in the system after the lines have been installed.The lines may riser/flange assembly). <br /> be purged of air by back pressuring the lines with an inert gas b. Apply a UL-classified non-toxic pipe thread <br /> such as helium or nitrogen to a pressure of 26 psi(172 kPa). sealant to the threads of the 1/4-inch NPT <br /> This may be done at the impact valve under the dispenser. straight vent tube fitting and install in tank <br /> When this pts bore has been reached,the leak detector will be test port of the packer. On 6-iach Big-Flo <br /> in the open position. By turning on the pump and gradually applications,the 1/4-inch NPT straight vent <br /> bleeding the gas from the line through a valve at the impact tube fitting may be installed into the riser/ <br /> valve of the farthest dispenser,the line may be purged of air. flange assembly. <br /> C. Apply a UL-classified non-toxic pipe thread <br /> e Disconnect power to the submersible sealant to the threads of the 1/4-inch NFT <br /> pump and relieve pressure before install- 90-degree vent tube fitting and install in the <br /> ing or removing petroleum equipment. leak detector vent opening in the cap of the <br /> 1. Disconnect power to pump at the load center. Tag or leak detector. <br /> lock out the breaker to avoid the pump being turned d Install the vent tubing into both fittings and <br /> on accidentally. tighten. <br /> 042.106-1 Aev.A 6/96 <br />