My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 3:50:07 PM
Creation date
6/3/2020 9:46:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 22 '97 O5:52PM mARLEYAw ItfrL 9138310207 P.10/10 <br /> For FK°Y rnodPta 9. Affix the enclosed ecals to the dispenser dial glass on <br /> a. Remove 1/4-inch pipe plug from tank test port in grade of gasoline upon which the leak detector is <br /> the Packer (on &inch Big-Flo applications, re- being installed. Additional decals are available;call <br /> move the 1/4-inch pipe plug from the riserlilange customerserviceat 1-800-952-8348or(913)498-5700. <br /> assembly). 10. Inspect all threaded joints to assure they are tightand <br /> b. Apply a UL-classified non-toxic pipe thread seal. not leaking. <br /> ant to the 1/4-inch NPT 45-degree elbow and <br /> install in tank test port of the packer.On 6-inch Test of the Leak Detector <br /> Big-Flo applications.the 1/4-inchNPT45-degree U.S.Environmental Protection Agency(EPA)regulations re- <br /> elbow may be installed into the riser/flange Quire annual verification of operation of leak detector. To <br /> assembly. assure maintenance of leak detection capability,Red Jacket <br /> c. install a 1/4-inch NPT tee on the 45-degree elbow requires that operation of the mechanical leak detector be <br /> that is in the tank test port(or on 6-inch Sig-Flo verified by testing upon start-up and that testing of the leak <br /> riser/flange assembly)to accommodate both the detector be performed routinely at least annually. <br /> vent tube and snap tap. <br /> d. Apply a UL-cl ed non-toxic pipe thread seal <br /> ant to the threads of the 1/4-inch NPT 90-degree • Test procedure medlar for mechanical <br /> elbow vent tube fitting and install in the tee. Ieak detectvrReportris am R explained R J21.The <br /> e. a UL-classified non-toxic pipe thread seal- Engineering Snap <br /> con cad ors a The <br /> APALY P Red Jacket Snap Tap connectors allow <br /> ant to the threads of the 1/4-inch NPT straight the FXZVMMDVleak detector to be tested <br /> vent tube fitting and install in the leak detector with the M Snap Tap Tester as as op- <br /> vent openinr in the cap of the leak detector. tion to the above test methods.See Red <br /> C Install the vent tubing into both fittings and Jacket literature $042.111-1 for test in. <br /> tighten. structions using Snap Tap Connectors. <br /> g. To install snap tap connectors in FX2V/FX2DV 11 The top cover on the Red Jacket leak detector is <br /> models, apply a UL-classified non-toxic pipe designed to accommodate a sealing wire which can be <br /> thread sealant to the snap tap connectors and used to discourage tampering or the unauthorized <br /> install one in the body of the FXV leak detector removal of the leak detector(see Fi <br /> and the other in the tee attached to the 45-degree >s 2). <br /> elbow installed in the tank test port ofthe packer. s It should be Doted that if the dispensing <br /> On 6-inch Big-Flo applications, install the two <br /> ssystem(the solenoid valve and the naaale) <br /> nap tap connectors — one in the FXV leak <br /> detector and one in the riser/flangeassembly. t opened test, <br /> theprevious V the completion of <br /> y the line test, tho FXV Series velli detect <br /> h. Attach and crimp loop of the retaining tether this opening as a leak and restricted flow <br /> around the Snap Tap threads. will result. Closing of the nozzle(s)for a <br /> L Replace the caps over the quick-connect cou- period of time adequate to allow comple. <br /> plings and tighten snugly. tion.of the line Last will allow the leak <br /> detector to open.Once opened,full pump <br /> DON overtighten. flow can be provided. <br /> • ItsiM 8oe technical bulletin x042.111-1 for use <br /> of Saap Tap Connector Assembly. <br /> 7. Connect power to pump at the load center. FX2Y/FX2D <br /> 8. Clear remaining air from system as follows: TETHERED <br /> a. Turn on dispenser that is farthest from the leak CAP <br /> detector but do not open nozzle.Wait four or five <br /> minutes or more. Look for leaks on parts <br /> worked on. SNAP TRP <br /> b. Shutoffthe pump and allow itto stand fouror five 45°ELBOW <br /> minutes. Then start the pump again and <br /> open the nozzle farthest from the leak detector. <br /> a Continue to dispense enough gasoline,about 20 <br /> to 30 gallons(76 to 114 liters),to pump ALL air Figure I <br /> from the Wsum. <br /> e1111u now is restricted to about 3 gpm <br /> (11 1pm)or less with the nozzle open,the <br /> leak deteawr has not opened-Repeat step <br /> sa with increased running time of pump SEALING WIRE <br /> to insure the purging of all air. All air (proviced oy contractor) <br /> must be purged from the system or the O <br /> leak detector will restrict flour to about <br /> 8 gpm(11 ipw). <br /> mafty1/44N04 <br /> R voce oF*ft Cr"W T-FITTING <br /> 7401 W.129 SZ_.Overland Park,KS 66213.913-498-5700 <br /> Marley Pump neurons the right to make design improvements and <br /> pricing modirationc as necessary and without notice. Z VENT TUBE <br /> CIM Marley Pump Panted in USA Figure <br />
The URL can be used to link to this page
Your browser does not support the video tag.