|
II
<br /> CONTAINMENT:
<br /> Sum Risers
<br /> e . R
<br /> 1
<br /> Monitor Well
<br /> With 2"Fittings
<br /> Annular Space
<br /> L i
<br /> 500 1,000 6-5 3/8' S1" 46" 4,000 3/16-
<br /> 675 1,087 4'-5 3/8" 70" 65" 5,500 3/16'
<br /> 1,000 1,404 6'-5 3/8' 70" 65" 8.000 3/16'
<br /> 2,000 2,319 12'-4 5/8" 70' 65' 15,500 3/16°
<br /> 2,500 2,777 15-4 5/8" 70' 65" 19,500 3/16'
<br /> 3,000 3.233 18'-4 5/8" 70" 65" 23.000 3/16'
<br /> 3,000 3,706 8'-81/2" 102' 97" 10,700 3/16"
<br /> i
<br /> 4.000 4,147 24'-41/2" 70" 65" 29,500 1/4-
<br /> 4.000
<br /> /4'4,000 4.397 11'-11/4" 102" 97" 30,500 3/16'
<br /> 5,000 5,186 13'-9318" 102" 97' 38,500 1/4'
<br /> 6,000 6,171 17'-13/8' 102" 97" 48,500 114"
<br /> 8,000 7.745 22'-4 5/8" 102" 97" - 63.500 114"
<br /> ~ 10,000 8.102 15'-101/2- 134 3/8" 129 3/8" 78,000 1/4*
<br /> 10.000 9.124 27'-0 5/8' 102' 97" 77,000 1/4-
<br /> 12,000 9,306 18'-11 1/2" 1343/8- 129 3/8" 93,900 1/4'
<br /> 12,0W 10,698 32'-3 718' 102" 97" 92,500 1/4"
<br /> 1500 14,177 23'-7 7/8" 134 3/8" 1293/8' 118,000 114'
<br /> 16,000 14,877 24'-41/2" 1343/8- 129 3/8" 125,400 5/16"
<br /> 20,000 17,680 30'-3 3/8' 134 3/8" 129 3/8' 155,000 5/16'
<br /> 25,000 24.348 37'-71/4" 134 3/8" 129 318" 190,000 3/8'
<br /> 30,000 27,277 36'-4 3/4" 148 143 228,000 3/8'
<br /> 40.000 32,527 49'-0' 148 143 308,000 3/8'
<br /> a7 p18 8111194 ®U The contractor shall provide the SuperTank'The primary tank shall be
<br /> built to UL S8 construction standards with the full thickness of steel listed in Table 3.1 of UL 58.The primarl
<br /> tank shall he isolated from the external environment and secondarily contained by Fiberglass Reinforced
<br /> Plastic(2M m;l nominal thickness)which is not attached to the tank except at the fittings.The primary tank
<br /> shall he factory tested to S psi internal pressure. Prior to shipment,the annular space shall be proof tested by
<br /> F; vacuum only to 20'hg vacuum The double wall tank shall have been tested in accordance with UL 1746
<br />
|