My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 3:51:40 PM
Creation date
6/3/2020 9:47:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_1999-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alpha <br /> Petroleum <br /> Services, Inc. <br /> General Engineering A Hazardous C61ID64 C 10 No 742466 <br /> Maintenance—Construction—Electrical Contractor <br /> San Joaquin County <br /> Environmental Health Department <br /> 304 E Weber Ave, 3rd Floor <br /> Stockton, Ca. 95202 <br /> PH :( 209) 468 -3431 <br /> FX :( 209) 464-0138 <br /> ATT: Laurie Cotulla, R.E.H.S. <br /> SUBJECT: USA- Petroluem,401 W Kettle men Ln. Lodi <br /> Work Scope: Replace the old fill bucket (prem.) with a new opw fill bucket. <br /> • Saw cut 3'x3'sq around the fill bucket. <br /> • Demo out the concrete from around the fill bucket. <br /> • Remove the pea gravel from the work area. <br /> • Remove the old bucket from the riser. <br /> • Install the new bucket on the riser. <br /> • Call for inspection (24hr lake test). <br /> • Backfill around the bucket with pea gravel. <br /> • Pour concrete back around the bucket. <br /> Please feel free to contact me with any questions (916) 416-2781 <br /> Thank you, <br /> —Keith Williams <br /> Project Superintendent <br /> Meaaa <br /> WHERE OLD FASHIONED SERVICE MEETS MODERN TECHNOLOGY!!! �Pl <br /> '!' RAF <br /> • <br /> P.O. Box 667 (707) 678-8100 <br /> nivnn CA 4Sh7(1 Trill FirPa 0071 A7R_R1 1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.