My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 3:51:40 PM
Creation date
6/3/2020 9:47:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_1999-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
itoring System Certification is <br /> Site Address: 401 W. KETTLEMAN LANE Date of Testing/Service: 02/04/2003 <br /> F. In-Tank Gauging /SIR Equipment ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑No- Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ®Yes ❑No- Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Q Yes No- Was accuracy of system product level readings tested? <br /> a Yes ®No° Was accuracy of system water level readings tested? <br /> M Yes ❑No• Were all probes reinstalled properly? <br /> 0 Yes ❑No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> "In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ®Yes ❑No. ❑N/A (Check all that apply)Simulated leak rate: [fl 3 g.p.h❑0.1 g.p.h 00.2 g.p.h <br /> FX-1 Yes E]No- Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> FX-1 Yes ❑No- Was the testing apparatus properly calibrated? <br /> ®Yes ❑No- ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes ❑No. ®N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ®Yes ❑No- ®N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑No- Q N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No" Q N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> L_I Yes ❑No- Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.