Laserfiche WebLink
Site Tested <br /> TIM nedormed_bv <br /> m Tesoro Corporation Product and Vapor Overfill Containment Serv.Sta. Sys. <br /> USA/Tesoro <br /> T 680 Quinn Ave. <br /> 401 W. Kettleman Ln. Test suit San Jose CA 95112 <br /> m Lodi, CA 95240 License* 465184 <br /> CDTech:Bryan Lundien <br /> M Test Date:2/24109 <br /> M <br /> M Test Method Developed By: ®Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer [j OtherS Test Method Used: ®Hydrostatic <br /> OD <br /> f +h'7 ❑Otherth+7 <br /> Test Equipment llsed:Measuring Tape Resolution:1/16 1n_ Example-1B"Increments, Pass/Fail Threshold or Criteria: Zero Loss <br /> Product Fill Bucket Vapor Fill Bucket <br /> wait Time Pass Pass <br /> Tank/Grade (min) Start Stop (hrs.) tial. Depth Initial-Final in Change Wall Gal. Depth Initial-Final=Change Wall <br /> 01 -Regu 5 2:15pm 3:15pm 1.0 5 12.25 12.25-12.25 =0.00 Pass <br /> 02 -Prem 15 2:15pm 3:15pm 1.0 5 11.25 11.25- 11.25 =0.00 Pass <br /> a <br /> cn <br /> c <br /> 0 <br /> :N <br /> rt <br /> W <br /> w <br /> U <br /> L <br /> 4! <br /> W <br /> M <br /> Comments: Include Information on repairs made prior to testing,and recommended follow-up for failed tests. <br /> m <br /> m <br /> N <br /> I <br /> E <br />