My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 3:55:06 PM
Creation date
6/3/2020 9:47:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB-25-2011 15.26 Service Station Systems 408 938 8888 P.05 <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: p Piping Manufacturer ® Industry Standard p Professional Engineer <br /> [] Other(Specify) <br /> Test Method Used: M Pressure i❑ Vacuum p Hydrostatic <br /> Other(Specify) <br /> 'fest Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution: 0.5% of span <br /> Piping Run#87 Piping Run#91 <br /> Piping Material: fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter, 3" 3" <br /> Length of piping Run: 100, 100, <br /> Product Stored: Gasoline Gasoline: <br /> Method and location of Reducer BoOtslFiaings Reducer BooWFiuings <br /> i ing-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 10:30 am 10:30 am <br /> Initial Reading(Ri): 5 psi 5 psi <br /> Test End Time: 11:30 am 11:30 am <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 111Our I hour <br /> Change in Reading(Rp-R,): None None <br /> Pass/Fail Threshold or No Detectable Loss No Detectable Loss <br /> Criteria: <br /> Test Result: L::j0 Pass ❑Fail 0 Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recrnnmended follow-up for ailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.