Laserfiche WebLink
FEB-25-2011 15:27 Service Station Systems 408 938 8888 P.08 <br /> „ r <br /> S.SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes p <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested a. <br /> Test Method Developed By: p Spill Bucket Manufacturer ® industry Standard ®Professional Engineer <br /> ®Other(Specify) <br /> Test Method Used: [] Pressure Q Vacuum ®Hydrostatic <br /> ®Other(Specify) <br /> Test Equipment Used: Cncon Sump Tester Equipment Resolution: +/-0.002" <br /> Fill Spill Box#87 Fill Spill Box#91 Vapor Spill Box# 87 Vapor Spill Box# 91 <br /> Bucket Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 1011 10" I0" I0" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min. 10 min. 10 min. 10 min, <br /> starting test: <br /> Test Start Time: 8:51 am 8:31 am 8:51 am 8:31 am <br /> Initial Reading(R,): 6.7103 4.9959 6.0334 6.3760 <br /> Test End Time: 9:06 am 8:46 am 9:06 am 8:46 am <br /> Final Reading(RF): 6.7103 4.9956 6.0324 6.3759 <br /> Test Duration: 15 min. 15 min. 15 min. 15 min. <br /> Change in Reading(RF-R3): None -0.0003 -0.0010 -0.0001 <br /> Pass/Fail Threshold or +/-0.002" +/-0.002" +/-0.002" +/-0.002" <br /> Criteria: <br /> Test Basalt: L- ® Pass ❑Fail ® Fass R Fail L� Fass Q Fail M Pass ❑ Fail <br /> Comments—(include information on repairs made prior to tasting, and recommended allow-u for ailed tests) <br /> TOTAL P.08 <br />