Laserfiche WebLink
TNG <br />E%ISIiNG T.E. <br />HEALY VAPOR <br />PROCESSOR UNIT <br />MISTING <br />EXISTING VENT RISERS <br />T.E. <br />I , <br />I , <br />I <br />EXISTING <br />BUILDING I <br />XI STING <br />EMERGENCY <br />SHUT-OFF <br />A SWITCH <br />I o� E%ISTING IT <br />UNDERGROUND FUEL <br />1 2 STORAGE TANKS <br />I <br />PREMIUM ®O ) o <br />1 (3) PARKING O / a <br />SPACES � <br />14K GALLONS <br />I LAR 0 <br />3 4 / REGUU® O \1 F <br />E EXISTING <br />1 14K GALLON$ / <br />I CANOPY _ — — <br />i. <br />1 1 <br />11. <br />t <br />1 <br />1 F <br />I EXISTING 1 x <br />® DISPENSERS 1 w <br />(TYP.) <br />is <br />1 <br />1 E%ISTING Fz I <br />1 FUEL w a <br />ISLAND <br />(TIP) EXISTING 1 <br />PRICE 1 <br />MOUNTED <br />1 POLE SIGN <br />?Q <br />E ?P ( <br />() NTER = _ � . � � � = EXISTING _ — - - - _— $ID <br />EXISTIND <br />G RIVEWAY STING EXISTING DRIVEWAY ' <br />KETTL_EMAN LANE <br />DIRECTIONAL ARROW/ GRAPHIC SCALE <br />N <br />W T E <br />0 10 S 20 30 <br />GRAPHIC SCALE <br />1'=10'-0' <br />VICINITY MAP <br />a > <br />N J <br />� 2 U <br />x <br />i a U <br />WITH FE PETRO MLD FOR 8] @ 91 <br />TANKS. p <br />U <br />SCOPE OF WORK <br />O <br />INSTALL (2) TURBINES IN THE 87 TANK <br />O2 <br />INSTALL (1) TURBINE IN THE 91 TANK. <br />O3 <br />THE TUM IS CURRENTLY LOCATED IN <br />THE STP SUMP, RELOCATE STP SUMP <br />TO THE FILL SUMP. <br />® <br />RELOCATE EXTRACTOR VALVE AND <br />ASSOCIATED PIPING TO THE BASE OF <br />m <br />THE PHASE 1 RISER. <br />O5 <br />FURNISH AND INSTALL NEW P <br />SYSTEM FOR THE (2) 8 RBINES <br />INCLUDING LEAK D OR AND <br />%" <br />OQQ}go <br />REOUIRED VEE ROOT MONITOR <br />~ <br />UPGRADES ERFORM A LEAK <br />DETE TEST ON THE NEW <br />Ha°id Pia <br />MENT. <br />S BUILT: <br />F <br />STALLED BRAVO SUMP UD ON THE <br />STPSUMPEPLACED <br />CHECKFp <br />E%ISTING LINE DETECTORS <br />WITH FE PETRO MLD FOR 8] @ 91 <br />TANKS. p <br />U <br />0) r <br />C d <br />N O <br />Y <br />6 <br />�WZ <br />m <br />Cn� rc <br />�oa� <br />%" <br />OQQ}go <br />_ s <br />~ <br />0 w tl w <br />Ha°id Pia <br />4` <br />OR <br />ER <br />ER <br />'��, <br />CHECKFp <br />10/05 2018 <br />SH T. TIRE <br />PLAN <br />m2_1 <br />SHEET <br />r, <br />Z, <br />= <br />S 1 <br />2 <br />