My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 4:05:16 PM
Creation date
6/3/2020 9:47:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR RECEIVED <br />(Submit minimum of 3 seta of plans & applications as originals will be retained by EHg T 18 ZO 16 <br />I, Site map enclosed? YESW NOH ENVIRONMENTAL HEALTH <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer trainlrD fffPX ftj8NtPch <br />person Installing or testing any component that Is repaired or replaced, i=nsure a copy of the "Site Health and Safety <br />Plan" I8 available on the jobslte as required by Title 8. <br />3_ Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />i�coK� <br />Sawcut concrete 7x7on the existing 87 main turbine sump. Remove existing turbine and Install 2 turbines_.._ <br />In the 87 tank and replace the exlsting turbine in the 91. Replace existing MLLD's with new PLLD's for the <br />UST's. <br />., <br />3 201? <br />NVIRONMEN TAL H AL.TH <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />3 <br />Received Time AP 0 3. 2017 2:30PM No,1250 <br />
The URL can be used to link to this page
Your browser does not support the video tag.