Laserfiche WebLink
Monitoring System Certification - Page 2 of 3 <br />Site Address: 401 W. Kettleman Ln. <br />D. Results of Testing / Servicing <br />Software Version Installed- 122.00 <br />Complete the following checklist: <br />Date of Testing/Servicing: 2123/17 <br />® Yes <br />❑ No* <br />Is the audible alarm operational? <br />® Yes <br />❑ No* <br />Is the visual alarm operational? <br />® Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />® Yes <br />11 No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />® Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />❑ N/A <br />operational? <br />Z Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ® Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ® Yes ❑ No <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />® N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? 0 % <br />❑ Yes* <br />N No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes* <br />® No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />No* <br />Was monitorings stem set -2 reviewed to ensure ro er settings? Attach set -y2 re orts, i a licable. <br />Egl❑ <br />❑ No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section <br />E below. describe how and when these deficiencies were or will be corrected. <br />E. Comments: Replaced TLS Battery for PM Purposes. <br />Tested E -Stops, all Passed. <br />Adjusted Disp 516 Regular float and chain, retested, passed <br />fflu <br />DEPARTMENT <br />