My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
601
>
2300 - Underground Storage Tank Program
>
PR0231348
>
COMPLIANCE INFO_1997-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 9:44:21 AM
Creation date
6/3/2020 9:47:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-1998
RECORD_ID
PR0231348
PE
2361
FACILITY_ID
FA0003803
FACILITY_NAME
KETTLEMAN CHEVRON
STREET_NUMBER
601
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04728006
CURRENT_STATUS
01
SITE_LOCATION
601 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231348_601 E KETTLEMAN_1997-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Discharge Head of the FE <br /> Petro Submerged Turbine Pump <br /> features state-of-the-art engi- <br /> neering. It has been designed to <br /> provide the ult.unate in ease of <br /> service and installation. <br /> Easy And Efficient <br /> This unit features a three corn- <br /> ponent.system for easy service <br /> or replacement.Tile line check : <br /> valve,extractable head and • <br /> the junction box can each be <br /> serviced individually from the <br /> top without disturbing the <br /> remaining two parts. <br /> Unique Features n <br /> When manifold tank instal- This valve, which is indepen- wires. A conduit water seal at <br /> lations are a factor,a syphon dent.of the removable head, is the outlet of the junction box i <br /> check valve is furnished to accessible by simply removing provided for the incoming <br /> assist in automatically main- two easv-to-reach bolts.. power"wires. <br /> - taining equalized product levels By turning the valve clamp No electrician is needed to <br /> in the tanks. screen-over the relief valve,air break a connection when the <br /> Each unit also features a for pressure testing the system pump and motor unit need to 1 <br /> built-in line pressure monitor can be introduced at any time removed. if at any time you nes <br /> port which eliminates the need through an air test opening. to remove the pump,all that i- <br /> for an auxiliary adapter housing. Air and vapor are removed required to break the circuit i, <br /> The line check valve. with from the product through a to simply turn the jack screw. <br /> built-in relief valve,.protects passage in the discharge head This <br /> the dispenser and piping from arid returned to the tank—below separates _ <br /> abnormal pressures. the product level—through a the <br /> steel vapor tube.This insures plug-in <br /> solid, air-free product deliver%- connec•- <br /> to the island dispensers. tion in an <br /> �+ Tile combination starting and explosion- <br /> running capacitor is completely proof <br /> contained in the discharge enclosute. <br /> manifold assembly,yet. Just lift <br /> remains separate from up and swing the wiring yoke <br /> the check valve and out of t he way to aut.ornatical I <br /> extractable head. disconnect the power to t he <br /> This completely sepa- primping shit. <br /> rates the capacitor <br /> housing from the fluid <br /> passage. A rintple two <br /> wire circuit eliminates <br /> _ color coding and any <br /> worry about crossing <br />
The URL can be used to link to this page
Your browser does not support the video tag.