Laserfiche WebLink
Por •3 - 5 <br />SITE PREPARATION AND SYSTEM DATA <br />CHECK TANK SYSTEM SIZE t - TANK I t -,l 2 • TANK f'__l 3 - TANK <br />CUSTOMER: O)OCA t__ <br />LOCATION NO.: 6"dig_ <br />CITY/STATE: 1-4wl CA <br />2 — -r, % " `F,:D <br />SYSTEM NO.: <br />PRODUCT: y�G' <br />SITE PREPARATION <br />VAPOR RECOVERY ❑ PLUGS C9 RISERS Q OTHER <br />VENT ❑ NO PREPARATION O/PEN TO ATMOSPHERE ❑ P•V VALUE REMOVED LJ OTHER <br />IJREMOTE/SUBMERSIBLE (DEPTH 1 <br />❑ SUCTION (HEIGHT I <br />CHECK VALVE <br />STRAINER <br />IMPACT VALVE <br />CHECK VALVE <br />STRAINER SUCTION CONNECTION <br />❑ REMOVED & OPEN <br />❑ REMOVED <br />❑ CLOSED <br />❑BURIED <br />❑ REMOVED ❑UNION <br />Gouge <br />Other (SPeclty) IN <br />OUT <br />Non FILL <br />GOU98 Other (SPeclty) IN OUT <br />IN PLACE <br />C� IN PLACE <br />❑�� OSED - <br />C,�tL//UG <br />❑ EXTRACTABLE <br />❑ IN PLACE ❑ COUPLING <br />❑ CLOSED <br />❑ REPLACED &COVER <br />OUT <br />CZI PEN <br />❑REMOVED <br />❑ REPLACED` COVER ❑OPEN WITH FOIL <br />REMOVEDCOVER <br />❑ <br />❑ OTHER <br />13 IN PLACE <br />❑OTHER ❑ OPEN NO FOIL <br />O& <br />❑ REMOREPLACED <br />❑ IN PLACE <br />❑OTHER <br />CAP <br />❑ OTHER <br />❑ OTHER <br />TEST 1 DATA <br />CALIBRATION <br />TANK 1 <br />TANK 2 TANK 3 <br />LOCATION <br />DROP TUBE <br />LOCATION DROP TUBE LOCATION DROP TUBE <br />FILL <br />Gauge <br />Other ISPeciey) <br />IN OUT <br />Nona <br />FILL <br />Gouge <br />Other (SPeclty) IN <br />OUT <br />Non FILL <br />GOU98 Other (SPeclty) IN OUT <br />None <br />T. PROBE <br />r7 DIVISION <br />a+pi zz 5- <br />t�yG� <br />Z4Ye 6' <br />BALANCE <br />CALIBRATION <br />IAVG. CC'S/DIV. 1. vs V 1 <br />LR = ±A DIVISIONS X CALIBRATION, CC CC IN OUT <br />OMINUTE y�1 DIVISION MINUTE <br />LRS6 <br />TEMPERATURE COMPENSATION ITC) CALCULATION <br />ABSOLUTE LEAK RATE IALRI CALCULATION 1 <br />ABSOLUTE LEAK RATE - 7 3e-'"- — +- 2e4 = e c/ <br />LEAK RA*EE TEMP. COMPENSATION CC/MIN <br />CC/MIN GA L/HO V R <br />❑ IF ALR i ± 0.05 GPM, A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS (CALCULATIONS ON CHART) <br />❑ A CHECK TEST WAS NOT CONDUCTED. <br />" 60 MINUTES/HOUR 3785 CC/GALLON • 0.015852 <br />LEVELS LOCATION 7744- <br />METHOD <br />IS SOLID ROO ❑ LIQUID <br />Time Tank I Tank 2 <br />Tank 3 <br />2 3 <br />4 <br />5 6 <br />AVERAGE <br />START <br />/174Ie7 <br />CC'S <br />�1-^ ,1 <br />ENR <br />r7 DIVISION <br />a+pi zz 5- <br />t�yG� <br />Z4Ye 6' <br />IAVG. CC'S/DIV. 1. vs V 1 <br />LR = ±A DIVISIONS X CALIBRATION, CC CC IN OUT <br />OMINUTE y�1 DIVISION MINUTE <br />LRS6 <br />TEMPERATURE COMPENSATION ITC) CALCULATION <br />ABSOLUTE LEAK RATE IALRI CALCULATION 1 <br />ABSOLUTE LEAK RATE - 7 3e-'"- — +- 2e4 = e c/ <br />LEAK RA*EE TEMP. COMPENSATION CC/MIN <br />CC/MIN GA L/HO V R <br />❑ IF ALR i ± 0.05 GPM, A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS (CALCULATIONS ON CHART) <br />❑ A CHECK TEST WAS NOT CONDUCTED. <br />" 60 MINUTES/HOUR 3785 CC/GALLON • 0.015852 <br />