My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
601
>
2300 - Underground Storage Tank Program
>
PR0231348
>
COMPLIANCE INFO_1997-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 9:44:21 AM
Creation date
6/3/2020 9:47:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-1998
RECORD_ID
PR0231348
PE
2361
FACILITY_ID
FA0003803
FACILITY_NAME
KETTLEMAN CHEVRON
STREET_NUMBER
601
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04728006
CURRENT_STATUS
01
SITE_LOCATION
601 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231348_601 E KETTLEMAN_1997-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Amount of time elapsed during the test N/A <br />5. Piping Pressure Test Leak Rate is N/A <br />If computer is used see computer printout of leakage rate and all <br />Lest parameters on Test Results, Part IV, Page 11, 1.2 <br />Test. results of storage systems that ut.il:ize pressurized piping <br />systems will not ba recognized unless t:he turbine pump is <br />activated after the complet-ion of a suc.cessfu] system test. <br />6. Was turbine pump activated? N/A <br />7. Pressure piping systems shall be tested under actual operating <br />pressures, and statement describing results must be included. <br />See #1 Above <br />8.. If applicable, has the isolation procedure in addition to the <br />product line been completed? N/A <br />NDE <br />TEC1iNOl,OGY, <br />INC. <br />PROPRIETARY <br />CAPACITY 10000 g PRECISION UNDERGROUND TANK 'TESTING <br />RESUM'S Patent Pending <br />TANK <br /># Sup. U111. <br />PAGE 5 <br />STAT <br /># 6015 <br />TEST PROCEDURES <br />TEST <br />DATE: 02/21/1989 <br />Copyright 1.985 <br />NDB <br />TECHN01.0(lY, INC. f'ROF'RIETARY <br />I <br />Piping Pressure Test - <br />N/A <br />2. <br />Pneumatic Pressure Data <br />Amount of pressure <br />applied <br />Lo syst.em: <br />N/A <br />3. <br />Amount: of pressure drop <br />if any: <br />N/A <br />4. Amount of time elapsed during the test N/A <br />5. Piping Pressure Test Leak Rate is N/A <br />If computer is used see computer printout of leakage rate and all <br />Lest parameters on Test Results, Part IV, Page 11, 1.2 <br />Test. results of storage systems that ut.il:ize pressurized piping <br />systems will not ba recognized unless t:he turbine pump is <br />activated after the complet-ion of a suc.cessfu] system test. <br />6. Was turbine pump activated? N/A <br />7. Pressure piping systems shall be tested under actual operating <br />pressures, and statement describing results must be included. <br />See #1 Above <br />8.. If applicable, has the isolation procedure in addition to the <br />product line been completed? N/A <br />NDE <br />TEC1iNOl,OGY, <br />INC. <br />PROPRIETARY <br />WATT INC. :3.1 31. FAIRHAVEN DRIVE, BAKERSFI:ELD, <br />CA 93:308 (805) <br />:322-9827 <br />
The URL can be used to link to this page
Your browser does not support the video tag.