Laserfiche WebLink
4. Amount of time elapsed during the test N/A <br />5. Piping Pressure Test Leak Rate is N/A <br />If computer is used see computer printout of leakage rate and all <br />Lest parameters on Test Results, Part IV, Page 11, 1.2 <br />Test. results of storage systems that ut.il:ize pressurized piping <br />systems will not ba recognized unless t:he turbine pump is <br />activated after the complet-ion of a suc.cessfu] system test. <br />6. Was turbine pump activated? N/A <br />7. Pressure piping systems shall be tested under actual operating <br />pressures, and statement describing results must be included. <br />See #1 Above <br />8.. If applicable, has the isolation procedure in addition to the <br />product line been completed? N/A <br />NDE <br />TEC1iNOl,OGY, <br />INC. <br />PROPRIETARY <br />CAPACITY 10000 g PRECISION UNDERGROUND TANK 'TESTING <br />RESUM'S Patent Pending <br />TANK <br /># Sup. U111. <br />PAGE 5 <br />STAT <br /># 6015 <br />TEST PROCEDURES <br />TEST <br />DATE: 02/21/1989 <br />Copyright 1.985 <br />NDB <br />TECHN01.0(lY, INC. f'ROF'RIETARY <br />I <br />Piping Pressure Test - <br />N/A <br />2. <br />Pneumatic Pressure Data <br />Amount of pressure <br />applied <br />Lo syst.em: <br />N/A <br />3. <br />Amount: of pressure drop <br />if any: <br />N/A <br />4. Amount of time elapsed during the test N/A <br />5. Piping Pressure Test Leak Rate is N/A <br />If computer is used see computer printout of leakage rate and all <br />Lest parameters on Test Results, Part IV, Page 11, 1.2 <br />Test. results of storage systems that ut.il:ize pressurized piping <br />systems will not ba recognized unless t:he turbine pump is <br />activated after the complet-ion of a suc.cessfu] system test. <br />6. Was turbine pump activated? N/A <br />7. Pressure piping systems shall be tested under actual operating <br />pressures, and statement describing results must be included. <br />See #1 Above <br />8.. If applicable, has the isolation procedure in addition to the <br />product line been completed? N/A <br />NDE <br />TEC1iNOl,OGY, <br />INC. <br />PROPRIETARY <br />WATT INC. :3.1 31. FAIRHAVEN DRIVE, BAKERSFI:ELD, <br />CA 93:308 (805) <br />:322-9827 <br />