Laserfiche WebLink
TABLE OF CONTENTS <br />Gen. Station Info. & Emergency Contacts Page 2 <br />General Site Safety Info. Page 3 <br />Emergency Response Procedure Page 4 <br />A copy of this page must be filled out and posted <br />conspicuously on site. <br />Daily Visual Monitoring Page 6 <br />Monitoring Double Wall Tanks Page 6 <br />Inspections To Be Conducted by Dealer <br />Secondary Containment Monitoring Procedure <br />Record Keeping for Secondary Containment <br />Electronic Monitoring Systems <br />Overfill/Spill Protection and Clean-up Page 7 <br />Deliveries/Gauging <br />Ball Vent Line Float System <br />Waste Oil Tank <br />Clean-up/Records <br />Inspections to be Coordinated by UNOCAL Page 8 <br />Yearly Inspections and Testing <br />Vadose/Groundwater Monitoring Wells <br />Employee Training Plan Page 9 <br />Outline for Mandatory Safety Training for All Employees <br />Forms To Be Completed (Copy these forms for your own use) <br />Quarterly Report <br />Form A <br />Daily Visual Monitoring Log <br />Form B <br />Inventory Reconciliation Sheet <br />Form C <br />Waste Oil Tank Gauging Sheet <br />Form D <br />Release Evaluation Checklist <br />Form E <br />Unauthorized Release Report <br />Form F <br />Equipment Test Log <br />Form G <br />Safety Training Log <br />Form H <br />NOT ALL INFORMATION IN THIS BOOKLET WILL BE APPLICABLE. REFER TO THE COVER <br />SHEET TO CONFIRM WHAT EQUIPMENT IS ON SITE. <br />1 <br />