My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
601
>
2300 - Underground Storage Tank Program
>
PR0231348
>
COMPLIANCE INFO_1997-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 9:44:21 AM
Creation date
6/3/2020 9:47:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-1998
RECORD_ID
PR0231348
PE
2361
FACILITY_ID
FA0003803
FACILITY_NAME
KETTLEMAN CHEVRON
STREET_NUMBER
601
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04728006
CURRENT_STATUS
01
SITE_LOCATION
601 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231348_601 E KETTLEMAN_1997-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEASE EVALUATION CHECKLIST <br />S/S #: Business Name. <br />Address: <br />Tank #: Capacity. <br />Product: <br />Date & Time Allowable Variation was Exceeded: <br />CHECK OFF EACH STEP AS IT IS COMPLETED. <br />STEP i <br />STEP 2 <br />STEP 3 <br />STEP 4 <br />STEP 5 <br />STEP 6 <br />L <br />I•ill out this form <br />wManever the <br />allowable varictio <br />is exceeded and <br />send in with the <br />Quarterly Report. <br />RECORDS REVIEWED Date/Time: Should be done <br />Performed by: within 2 hours. <br />NEW RECONCILIATION <br />Date/Time: <br />Should <br />be <br />done <br />PERFORMED <br />Performed by: <br />within <br />24 <br />hours. <br />DISPENSER METER Date/Time: Should be done <br />CALIBRATION CHECKED Performed by. within 3 days. <br />(COMPLETE TEST REPORT) <br />STEP 7 (-1 HYDROSTATIC PRESSURE Date/Time: Should be done <br />(—J TEST PERFORMED ON PIPING Performed by: within 4 days. <br />PRECISION TANK TEST <br />Date/Time: <br />Should <br />be done <br />PERFORMER <br />Performed by. <br />within <br />5 days. <br />�j ADDITIONAL <br />INVESTIGATION <br />Date/Time: <br />Should <br />be done <br />UU PERFORMED <br />AS REQUIRED <br />Performed by: <br />within <br />5 days. <br />Briefly <br />i <br />I hereby certify this is to be a true and accurate report. <br />Dealer's Signature: Dote, <br />
The URL can be used to link to this page
Your browser does not support the video tag.