Laserfiche WebLink
08 NEED MONITORING AND RESPONSE PLAN.�� <br />9- NEED PROOF OF FINANCIAL RESPONSIBILTY. <br />-10 NEED TO SUBMIT WRITTEN FILLING PROCEDURE FOR THE MOTOR VEHICLE <br />FUEL TANKS [IF NOT USING A TANK LEVEL MONITOR WITH EITHER 1) <br />ALARM OR 2) AUTOMATIC SHUT OFF VALVE]. <br />11- NEED CONTRACTOR INFORMATION. NEED TO KNOW WHAT CLASS <br />CONTRACTOR IS AND NEED CURRENT WORKERS COMP INFORMATION. WE <br />WILL NOT ISSUE ANY PERMITS WITHOUT CONTRACTOR INFORMATION <br />SUBMITTED. <br />�2 APPLICATION INDICATES TANKS WILL BE ANCHORED BY DEADMAN OR <br />SLAB YET NOTHING IS INDICATED ON BLUELINES. <br />13- APPLICATION INDICATES PIPING MANUFACTURER TO BE "RED JACKET" <br />I WAS NOT AWARE THEY MANUFACTURED PIPING, PLEASE SUBMIT <br />� BROCHURES. IF YOU MEAN TO SAY THE MANUFACTURER IS A.O. SMITH <br />(LIKE THE BLUELINES INDICATE FOR SECONDARY CONTAINMENT) THEN <br />STATE THAT. NEED TO STATE THE MANUFACTURER FOR THE PRIMARY AS <br />WELL AS SECONDARY CONTAINMENT PIPING. <br />CLOSURE PLANS <br />THE AUTHORIZATION TO RELEASE FORM NEEDS THE LABORATORY NAME <br />LISTED AND THE FORM NEEDS TO BE DATED. <br />2,- THE AUTHORIZATION TO RELEASE FORM NEEDS TO BE SIGNED BY THE <br />OWNER/OPERATOR, IT IS UNACCEPTABLE FOR AN "AGENT" TO SIGN FOR <br />THE OWNER. <br />©C/o NEED TO INDICATE THAT PIPING WILL BE HANDLED THE SAME AS UGT <br />�'•J (ie: HAULED AS HAZARDOUS WASTE OR CLEANED ON SITE WITH THE <br />RINSATE HAULED AS HAZARDOUS). <br />o ,��ED THE NAME OF THE HAZARDOUS WASTE HAULER. <br />05-' <br />NEED SITE HEALTH AND SAFETY PLAN. <br />SHOULD YOU HAVE ANY QUESTIONS REGARDING THE ABOVE INFORMATION <br />CONTACT KASEY FOLEY AT (209) 468-3468. <br />