My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
601
>
2300 - Underground Storage Tank Program
>
PR0231348
>
COMPLIANCE INFO_1997-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 9:44:21 AM
Creation date
6/3/2020 9:47:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-1998
RECORD_ID
PR0231348
PE
2361
FACILITY_ID
FA0003803
FACILITY_NAME
KETTLEMAN CHEVRON
STREET_NUMBER
601
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04728006
CURRENT_STATUS
01
SITE_LOCATION
601 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231348_601 E KETTLEMAN_1997-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v�ceAr.`�aae/arA.Y+la k CLEAN UP <br />1. <br />DELIVERIES/GAU--A&-- <br />Qgalgr <br />is respo ible to ensure that the dem very he or she requests <br />is not in excess of the tank capacity, taking into consideration the <br />amount currently in tank. Driver is to gauge tank to assure capacity <br />is available for the entire load and must remain in attendance during <br />the entire delivery to monitor the operation. <br />2. BALL VENT LINE FLOAT SYSTEM <br />(Only for double-wall tanks installed after July 1986.) <br />The ball float valve system installed with the tank substantially <br />prevents the possibility of overfill occurring. If the tank is filled <br />to the ball float level, the petroleum product delivery will be cut <br />to 3 gallons per minute alerting the driver of a potential overfill <br />condition. In the event that this occurs, the following actions will <br />be taken: <br />1. The delivery truck driver shall turn off the petroleum product <br />supply at the truck, leaving the hose fully connected to the tank <br />fill pipe line and the truck. <br />2. The small amount of petroleum product remaining in the hose shall <br />be slowly drained into the tank. Since the ball float valve is 2 <br />to 3 inches below the top of the tank, there remains a 100 + gallon <br />capacity within the tank at the moment when the ball float closes <br />off delivery. The bleed hole in the ball float valve allows the <br />remaining petroleum product in the hose to completely drain through <br />the fill pipe into the tank. <br />3. The hose shall be disconnected from the fill pipe only when it has <br />fully drained. In the event that spillage occurs upon hose <br />disconnection, the remaining small amount of petroleum product will <br />be properly contained. <br />3. WASTE OIL TANK <br />1. Station is equipped with waste oil buckets which hold a maximum <br />capacity of 3 gallons (about 3 to 4 cars' worth of waste oil). <br />2. Prior to dumping any waste oil, dealer is to gauge the tank to <br />assure that holding capacity is greater than that which will be put <br />into the tank. <br />3. Waste oil is poured directly through fill/pump out pipe, using a <br />funnel. Should any waste oil spill during this operation, it will <br />be properly contained using absorbent material. <br />Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.