Laserfiche WebLink
CJLtULC Listed Red Threat II A Piping System <br /> Lowest Total Cost of Ownershipt <br /> Benefits of [Material Cost+Installation Cost] _System Life <br /> Fiberglass Piping in tMaintenance costs and replacement casts not required with RED THREAD 31A piping system. <br /> Underground Fuel <br /> Applications •Thirty-Year • Outstanding Corrosion <br /> " Warranty's- With Resistance-RED THREAD IIA <br /> over 40 years proven piping systems resist internal and <br /> TIME TESTED performance in the external corrosion from hazardous <br /> a„ <br /> marketplace, soils,fuels and other corrosive <br /> • 30-Year Warranty Underwriter's fluids.Corrosion resistance is <br /> Laboratories, Inc.and verified by long-term total immersion <br /> • Installed since 1964 Underwriter's Laboratories testing(I.D.and{O.D.)of the <br /> Never been removed due Canada(UUULC)Listed RED fiberglass systems.Long-term total <br /> • THREAD IIA pipe,fittings and immersion testing is not currently <br /> to fuel incompatibility adhesive carry a 30-year warranty. required by UL 971 for flexible <br /> The product is warranted to be systems. <br /> • Total immersion testing in free from defects in material and <br /> fuels workmanship-and against internal •Quality Assurance-Smith <br /> and external coffosion-when used for Fibercast quality assurance <br /> • Case History G7301 underground transportation of fuels. procedures meet or exceed the <br /> fest requirements of UUULC. <br /> -Leak Prevention-New sump Smith Fibercast 900%prooftests <br /> entryttermination fittings provide all piping, which exceeds current <br /> positive seal at the sump to help UL requirements. <br /> LOWEST TOTAL COST OF prevent leaking of underground fuel <br /> OWNERSHIP in or out of the a <br /> sump.This fitting <br /> • No reinstall costs due to also helps provide <br /> fuel incompatibility Class I(leak <br /> prevention) <br /> • Homogenous -system protection which <br /> y complies with <br /> no liner,no bladder,no jacket California's <br /> requirement for <br /> continuous <br /> interstitial monftoring <br /> of the piping <br /> A TRUE PIPE IN A PIPE system's secondary <br /> • Interstitial space containment. •Permeability-RED THREAD IIA <br /> communication -Exceptional Flow permeability resistance greatly <br /> Characteristics- exceeds UL allowable <br /> • Leak prevention, RED THREAD IIA pipe has the permeability. <br /> not leak detection largest I.D. in the fueling UL 971 requires permeability <br /> industry-allowing you to sell twice <br /> INSTALL IT BURY IT, the fuel per foot than any 1 112" testing as follows: <br /> • flexible product on the market. - 180 days for primary pipe <br /> FORGETIT! -30 days for secondary pipe <br /> Three-inch RED THREAD IIA Smith Fibercast permeability <br /> fiberglass pipe has a nominal testing is based on 180-210 days. <br /> 3.36" LD.;four-inch pipe has a <br /> 4.36"I.D. <br /> Please review Smith Firercast's written warranty to determine the terms and conditions. <br /> 2 <br />