Laserfiche WebLink
Clear Day Page 1 of 2 <br /> Aris Cacapit [EH] <br /> From: Kenneth E. Wendt[ken@wendtandsons.com] <br /> Sent: Tuesday, August 19, 2008 2:29 PM <br /> To: Aris Cacapit[EH] <br /> Subject: RE: Scope of work for EVRII upgrade at 1225 W. Lockeford St. Lodi <br /> Dear Mr. Cacapit, <br /> Re: Scope of Work for EVRII upgrade at 1225 W. Lockeford St Lodi. <br /> 1.We will use the existing low voltage intrinsically safe conduit under the dispensers to pull the VFM cable <br /> through, we will remove the existing Beldon cable <br /> that is being used by the sump sensor and pull back TWO NEW Beldon cables, one for the existing sump <br /> sensor and one for the ISD flow Meters per the <br /> Manufacturer's specifications.We do not re-use existing cable due to the fact it may become damaged when <br /> removing and replacing it. <br /> 2. No excavation/trenching will take place at this site, other than what is required for the Healy tank pad <br /> foundation. <br /> 3.We will be using existing conduit that is already in place, no alterations of any kind will be made to the UDC's. <br /> 4. No new penetrations will be made into the existing sumps/UDC's. <br /> Thank You, <br /> Kenneth E. Wendt <br /> Wendt Construction <br /> From: Aris Cacapit [EH] [mailto:acacapit@sjcehd.com] <br /> Sent: Tuesday, August 19, 2008 11:38 AM <br /> To: ken@wendtandsons.com <br /> Subject: Scope of work for EVRII upgrade at 1225 W. Lockeford St. Lodi <br /> From: Aris Cacapit [EH] <br /> Sent: Tuesday, August 19, 2008 11:35 AM <br /> To: Willy Ng [EH] <br /> 8/20/2008 <br />