Laserfiche WebLink
02/05/2009 08: 11 9153712450 BZ MANITANENCE PAGE 87/13 <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE I (One form per facility) <br /> Ty;eEOr A;CTIOMN D 1.NEW PLAN [3 2.CHANGE OF INFO 11ON Rol.. <br /> 1. FACILITY INFORMATION <br /> FACILI <br /> FACILITY SITE ADDIXESS <br /> ff. SPILL CONTROL AND CLEANUP METHODS <br /> > Ifalb to do so.facility personnel will take iromedime measures to contiol or trop a"raltsm(e.g.,scitivate Pump shtit-off,dc.)and,if neccvtary,safely remove <br /> remaining hazardous rmtedol ftm the UST system. <br /> > Ally release to secondary ridary contihimer em <br /> , containmert will bc pumped or otherwise removed within a time corisistisat with the ability of the seco I syst to <br /> contain the h=rdous material,but not greater than 30 calendar days,or sooner ifrequired I&the local agancy, Fecovered ha7tardous matorialsunlew still suitublc <br /> for their intended um will be Managed as hawrdous vzstc, <br /> > Absorbent intaurig]will be kned to coptain Rnd clean vp rnnnsm"ble spills ofliazarx1ous materials. Absorbent material may be reiised untill itbeenmos inn Raturattid <br /> In',7e efFectivo, It will then be marogcd property,Used SIMT�Cnt MWgrjRl,FMAbl*Or Waste,will be stated in a property labeled and <br /> > Facility penorlitel will determine whether or no any water removed fmmimcaarlary containment Rymems,or fo im cleim-up activity,his been ir cor4act with any <br /> hamirdous material. If the water N contaiminated, 1; will be mamr-d as h=r&tn waft If the vxftr has a panralcum $hen (i.e.. rainbow colors). ft is <br /> contbimiritted, A thick floating petroleum layer may not necessarily diRplay rld"bow colors, Water(hn&vdouq or rlon-ha=Hous)from qumrs,spill contairiorq,ow. <br /> > We vdll reviewseenridary confainincrit."lems for polisible deterioration ifany ofthr following conditions occur: <br /> i. X=tdous material in contact with socandw-y corrAinmcnt is not orimpatHe with the Maladal Used forticcordary corritainmett; <br /> 2. Secondary contRinment is prime to damage,from any equipment used to renrove or cleanup hum-dous matcr�ttl collcictcd In secondary corraimnen� <br /> 3. Rvardmn material,other than tliv prodact/mate,stored in the pritnity collitalroment syllit6m, �i placed inside ncondary containment to treat or noutimli7p <br /> releated product/wastr,and the added material orresulting material from stch a combiratott is notcompatible withsecandary containment, <br /> M. SPILL CONTROL AND CLEAN-UP EQUIEPHENT <br /> PrATUDIc PABN Erg; 951-11�oontml ar-d—alcon--up equipment kapt permanently oti-Rft is listed in the facility's Hazardous Materials flusineng Plan, This <br /> equipment is inqparted at.leasit mrtfily.and after cacti use,and supplies are replenished as neededl. <br /> rpil lat. ?3i. <br /> it 1 <br /> it 5 <br /> RK <br /> 06. <br /> IV. RESPONSME,PERSONS <br /> NA"F R40 TMX. <br /> NAM PAI <br /> RA-52 R43. rraF R53, <br /> 71iii information is required ggal when .rice orthe hultrdous submince can not be determined directly by tile monitoring method usexi where liquid level <br /> mensurement.s in a tank annular space Of Secondary Pi-)iU art Oiled as the basis for leek doteminAcm), <br /> TKE FOLLOWING STEPS WILL BE TAKEN TO DMWN11TIVE THE 1`118SLNCE OR ABSENCE OF HAZARDOUS SUBSTANCE IlN TIF-SECONDARY <br /> &ICEmD-e(0wo3)~um <br />