My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:39:04 PM
Creation date
6/3/2020 9:47:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Repair procedures Center the coupling around the gap in the pipe. <br /> (cont.) Abrade all bonding surfaces before applying adhesive. <br /> • Coat the cut ends of the pipe and bonding surfaces with adhesive,then bolt the <br /> coupling halves together. <br /> 3 <br /> Apply adhesive to max <br /> cut ends of pipe Glued areas <br /> Fig.9-3.Moderate damage can — <br /> be repaired by cutting out a short <br /> length of pipe and joining the <br /> ends with a complete coupling or <br /> a half-coupling. <br /> 1 min <br /> Square-cut pipe ends <br /> (not tapered) <br /> Half-coupling <br /> (full coupling optional) <br /> Major damage(over 3 inches in length) <br /> Damage in which more than three inches of pipe must be removed is considered major. <br /> Major damage is typically caused by excavation equipment or large objects striking the <br /> pipe.Repair major damage with a replacement nipple and one or more repair couplings. <br /> • For damage less than 12 inches in length,a single full-size,14-inch long coupling <br /> will provide the required 1-inch pipe insertion at each end. <br /> • To make repairs greater than 12 inches in length,use two full-size or half-couplings <br /> tojoin the replacement nipple with the existing line as shown in Fig.9-5. <br /> • Follow the guidelines given for minor damage:abrade all bonding surfaces,coat all <br /> cut pipe ends with adhesive and observe spacing and insertion depth require- <br /> r———————————— ments. <br /> Failure to restrict the maximum gap <br /> between pipe ends to 3 inches and <br /> to provide a minimum 2-inch <br /> insertion depth of pipe in the repair I 3<Repairarea<10 <br /> couplings nullifies the <br /> UL listing mark. I Gluedareas <br /> L------------J <br /> Fig.9-4.Major damage is repaired by rJ— <br /> removing the damaged pipe.Affected IN/ <br /> areas under 10 inches in length are <br /> repaired using a full-length coupling to <br /> hold a pipe nipple. ( 3 max <br /> 1 min —► gap <br /> Full coupling <br /> do Repair area>10 <br /> Fig.9-5.Repairs over 10 inches inGlued areas 3 max <br /> length are made byjoining a <br /> replacement nipple to sound pipe <br /> with whole orhalf-couplings at <br /> each end. <br /> 1 min <br /> Half-coupling <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.