02/05/2003 08:11 9163712450 BZ MANITANENCE PAGE 12/13
<br /> 0 0
<br /> UST Monitoring Plan—Page 1 Instructions
<br /> Cump)cft a sepasse,UST Monitoring Plan for each UST monitoriag system at the facility. This forth Must be submitted with your initial UST
<br /> Operating Permit Application and within 30 days Of changes in the InfbMation it contains. Please note that your local agency may require you to
<br /> obtain approval prigI to installing or modifying monitoring equipment. (Note: Numbering of the"instructions follows the data element numbers on
<br /> the fwm')
<br /> M.01. TYPE,OF ACTION—Cheek the apptopriitt box to indicate why this plan is being submitted.
<br /> NfU PLAN TYPE—Check the appropriate box to indicate whether this plan emem all,or merely some,of the UST,it the facility. if the plan covers only
<br /> some.of the tanks,identify those twkR in the apacc provided by using the Tank ID N(s)in item 432 of the UST Operating Permit Applicahm--
<br /> Tank
<br /> Tank Fmm(s)].
<br /> FACILITY IT)NUMPIER—This space is for agency use only.
<br /> M01 17ACEUTY NAMF3—Enter the complete Facility Nam,c,
<br /> M04. FACILITY SITE ADDRESS—Eimer the street address where the facility is located,including building number,if applicable,Post office box numbers
<br /> are not acceptable, This iliforization must provide it me=to locate the facility geograjibically,
<br /> M05. CITY—Enter the city or unincorporated amp in which the facility is!neftel,
<br /> M06, MONITORING EQUIPMENT IS SERVICED—Checked the appropriate box to specify the frequency of monitoring equipment te5ting/carlification,
<br /> MOT SPECIFY—If item U-99 is checked,enter the frequency of monitoring equipment tcsting/ccrtifcadan.
<br /> M10, TANK MONITORINO ME-114OD(S) —Check die appropriate box(cs)in Section IV to identify all required methods used ror monitoring LIST(3)
<br /> covered by this)than,
<br /> M!1, SECONDARY CONTAINMENT IS—Check the appmpHate box to describe the envirormin Inside tank Secondary oontainmori.
<br /> M13, rAODeL 9—if item EV-11 is checked,enter to model number fbr the motiltoring m1cm,control panel,
<br /> M14, LEAK SENSOR MANUFACTURER—If item TV-1 it checked,enter the name of the manurherwer of the scnsor(s).If additional spa=Ls needed,use
<br /> Section IX.
<br /> M15. MODEL#(S)—If item IV-1 is checked,enter the model trumberfor each type of sensor installml,if additional space is needed,use Section IX
<br /> M16, PANEL MANUFACTURER—If item IV-2 L,%checked,enter the nun of the manufauttm of the monitoring system control panel(console),
<br /> MT,7. MODEL 0—If item IV-2 is checked,enter Me model number for the monitoring system control panel,
<br /> M18. IN-TANK PROBE MANUFACTURER--If item TV-2 is checked,enter the name of the manufacturer of the probc(s).
<br /> M19. MODEL N(S)—if item IV-2 is checked,enter the model number trot each type of in-tank probe installed.If additional space is nec&4 use Section IX
<br /> M20, LEAK TEST rMUENCY—if item TV-2 is checked,check the appropriate box to dcscribc the in-tank Ical<test frequency,
<br /> WI, SPECIYY—If item M20-o is checked.,enter the frcqucricy of programmed leak t"tq.
<br /> M22. PROGRAMMED TESTS—If item IV-2 is cheekod,check the appropriate box to describe the tests programmed into the ATO*stem.
<br /> M23. SPECIFY—if item bCZ-e is checked,enter the frcqucnoy of in-tank leak testing.
<br /> M24. INVENTORY RECONCILIATION—If item IV-3 is chocked,check tlic appropilatc,box to demrifir the type of inventory reconciliation performed
<br /> (ix.,Manuel or Statistiael).
<br /> M25. TESTING PERIOD—If item IV-4 iv checked,check the appropriate box to deparilic the VITO testing period.
<br /> M76. TFST FREQUENCY—If item IV-5 is checked,check the appropriate box to describe the frequency of tank intop.riity te.9ting.
<br /> M27. SPECIFY—If item 1v-5-c,is checked,enter the frequency of tank integrity toting.
<br /> h28. SPECIFY—If item TV-99 is checked,enter a brief description or the other tank monitoring method(s)used(e.g..vadorc zinc monitoring per 23 CCR
<br /> §2647,groundwater monitoring per 23 CCR§2648), include the monitoring ficquency(e.g.,ContinuotLi,Weekly). if-additional space is noadeid,use
<br /> Section IX,
<br /> M- 30, PIPE MONITORING METI-IOD(S)—Cheek the appropriate box(es)in Section V to identify all required methods used for monitoring piping in the
<br /> USTsystom(s)covered by this plan.
<br /> M31. SECONDARY CONTAINMENT is—Check the appropriate box to describe the environment inside piping icconday coatairimarA,
<br /> M32, PANEL MANUFACTURER—If item V-1 is cheeped,enter the name of the manufodurcr of the monitoring system control panel(console),
<br /> M13 MODEL 9—If item V-1 Is checked,enter the model number fpr the monitoring system control panel.
<br /> M34. LEAK SENSOR MANUFACTURER—If item V-1 is checked,enter the nimic,of the TA41010101111tef of the s0fis0f(s).
<br /> M35. MODEL#(9)—Iritern V-1 is checked,enter the model number far each type of sensor installed.If additional space is needed,use Section IX
<br /> M36, W11.%PTPrNG LEAK ALARM TRlOGER PUMP SHL7DOWN7—If item V-1 Is checked,check Yes or No.
<br /> M37. WILL FAILLTzOISCONNECTION OF MMTOMO SYSTEM 1]UOGFR SWtJTW'%W?—If item V-I is checked,chock Yes or No.
<br /> M38 MjjD MANIJFACTURER(S)—If item V-2 is checked,enter the TIRMC(S)Of thornpifillfhOnIfer(s)of the mechanical line leak dettetoilq).If additional
<br /> ,space is needed,use Section IX.
<br /> M39, MODPI,0(s)—If item V-2 is checked,enter the model number for coch type of mechanical line leak detector installed.if additional space is rtecdcd,
<br /> use Section IX.
<br /> M40. ELLD MANUFACTLMI-It—If item V-3 is checked,enter the name of the manufsailmor of the electronic'int leak detector(s).
<br /> M41, MODEL#(8)—If Win V-3 is checked,enter the model number for each type of electronic line leak detector installed.If additional trace is needed,use
<br /> Section IX
<br /> M42. PROGRAMMED LINE INTEGRITY TESTS—If Item V-3 is checked,chock the appropriate box to describe the typc of testa prtigraintriod into the
<br /> monitoring system.
<br /> M43. W11.1 FLLD DETECTION OF A PIPING LEAK ALAPM TRIGGER PLW SHUTDOWN?—If item V-3 is checked.ciicok'Yes or No.
<br /> M44. WILL ELLD FAILURE01SCON1,M-CTION TRIGGER pUmpS14UTDOWN?—if Ram V-1 is checked,chock Yes or No,
<br /> M45. 'TEST FREQUENCY—It item V-4 is cho*0,cheek the appropriate box to describe the frecittency of pipe iniceTity tc4tirl&
<br /> M46. SpFrlFy—if item V4-c is checked,enter the frequency of pipe integrity testing,
<br /> M47. VIS'k.TAL MONITORING DONE —If itern V4 is checked,check the appropriate box to describe the fmquoncy of visual monitoring.
<br /> M48. SPECIFY—If item V-99 is chodAWd,enter a bricf description or die other line m0nithriftg method(s)used, if additional space is needed,use Section
<br /> IX, Be sure to clearly describe monitoring mothad(s)and frequency,
<br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(ix.,location of
<br /> cnah sensor, line leak detector, mono orin F)a*in control.panel, etc,), if you already have a di sg=(e.g., current UST Monitoring Site 71im frim a
<br /> Monitoring System Cortiflestion form,Hazardous Materials Boniness Plan map,etc.)which shows all required information,include it with this plan.
<br /> 07MM
<br /> ,UCEliU)6d(Q7A0)-2/4
<br />
|