Laserfiche WebLink
California Code of Regulations(CCR),Title 23 Chapter 16 Table B for complete <br /> List). The component must bear the appropriate mark as required by the <br /> independent testing organization. <br /> 5. Any changes in information and scope of work must be submitted to EHD for <br /> approval prior to commencing work. All new addenda supersede the previous <br /> ones. <br /> 6. Contact Garrett Backus to arrange the following inspections(a 48 hour notice is <br /> required): <br /> a. Verify corrosion protection on the diesel fill riser before back filling. <br /> b. One hour hydrostatic test(or equivalent)on the diesel spill bucket. <br /> c. Verify the five gallon capacity and drain valve operation of the diesel spill <br /> bucket. <br /> 7. If concrete is broken near the UST, a third party tank integrity test and/or line <br /> integrity test(or equivalent)must be performed,once concrete is poured in <br /> accordance with the manufacturer's guidelines. Results must be received by the <br /> EHD within seven days of returning the facility to operating condition. <br /> 8. A"Certificate of Compliance for Underground Storage Tank Installation Form C" <br /> shall be submitted by the owner or the owners'agent[pursuant to(CCR)2635(d)) <br /> before this repair will be considered complete by the EHD. <br /> If you have any further questions,please contact me at(209)468-2986, fax to(209)468- <br /> 3433 or email to gbackus@sjcehd.com. <br /> Thank you, <br /> arrett Backus <br /> Senior Registered Environmental Health Specialist <br /> Page 2 of 2 <br />