Laserfiche WebLink
Software Version Installed: " <br /> C m lets the folio in checklist: <br /> es ❑ No* Is the audible alarm operational? <br /> Yes ❑ No* Is the visual alarm operational? <br /> tYYes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? <br /> O/yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> LlN/A monitoring system detects a leak,fails to operate,or is electrically disco ected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) KaksEl <br /> Sensors Dispenser ontamment Sensors. <br /> Did you confirm positive shut-down due to and sensor failure/disconnection'? Yes; No. <br /> L3Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ❑JN/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s) and operating properly? If so, at what.percent of tank capacity does the alarm trigger? <br /> ❑ Yes* ❑ o Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑ Water. If yes,describe causes in Section E,below. <br /> Wy-es ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if applicable <br /> Yes ❑ No* I Is all monitoring equipment oerational per manufacturer's secifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> c� <br /> E. Comments:4)f Y2 2 i 9 41a1r, 1t <br /> t <br /> i <br /> I <br /> i <br /> i <br /> i <br /> Page 2 of 3 x 03/01 .. <br />