Laserfiche WebLink
0 0 <br /> Underground Storage Tank System Designated UST Operator onthly Inspection Report—Page 2 of 2 <br /> Comments: 614-6-Z) 772.* lxti r <br /> Required Follow-Up Actions: <br /> INSTRUCTIO S <br /> 1. The monthly UST system inspection must be conducted by a Desig ated UST Operator who possesses a current"California <br /> UST System Operator"exam issued by the International Code Coun ii(ICC). <br /> 2. The Designated UST Operator must alert the UST Owner or Operat r of any condition discovered during the monthly visual <br /> inspection that may require follow-up actions. <br /> 3. A copy of this monthly inspection report must be provided to the US Owner or Operator. <br /> 4 The UST Owner or Operator must maintain a copy of each monthly i spection report and all attachments for the most recent <br /> 12 months. The records shall be maintained on-site or, if approv d by the local agency, off-site at a readily available <br /> location. <br /> UN-057-2/2 WWW.anidocs.org 9/26/05 <br />