Laserfiche WebLink
Underground Storage Tank System Designated UST Operator rV lonthly Inspection Report—Page 2 of 2 <br /> Comments: <br /> Required Follow-Up Actions: p. <br /> INSTRUCTIO S <br /> 1. The monthly UST system inspection must be conducted by a Designated UST Operator who possesses a current"California <br /> UST System Operator"exam issued by the International Code Counci (ICC). <br /> 2. The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during the monthly visual <br /> inspection that may require follow-up actions. <br /> I A copy of this monthly inspection report must be provided to the UST Owner or Operator. <br /> 4 The UST Owner or Operator must maintain a copy of each monthly in pection report and all attachments for the most recent <br /> 12 months. The records shall be maintained on-site or, if approve by the local agency, off-site at a readily available <br /> location. <br /> UN-057-2/2 www.unidocs.org 9/26/05 <br />