Laserfiche WebLink
i <br /> Underground Storage Tank Syste Designated UST Operator AV,onthly Inspection Report—Page 2 of 2 <br /> r <br /> I <br /> Comments: P214-1XIIA-6-. <br /> i <br /> i <br /> 1 <br /> i <br /> i <br /> Required Follow-Up Actions: t�nb 7l2�,t.�j ,- <br /> I <br /> I <br /> i <br /> INSTRUCTIONS <br /> 1. The monthly UST system inspection must be conducted by a Designated UST Operator who possesses a current"California <br /> UST System Operator"exam issued by the International Code Counolil(ICC). <br /> 2. The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during the monthly visual <br /> inspection that may require follow-up actions. 1 <br /> 3. A copy of this monthly inspection report must be provided to the US F Owner or Operator. <br /> 4 The UST Owner or Operator must maintain a copy of each monthly i spection report and all attachments for the most recent <br /> 12 months. The records shall be maintained on-site or, if approv d by the local agency, off-site at a readily available <br /> location. <br /> UN-057-2/2 www.uiiidoes.org 9/26/05 <br />