My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:38:11 PM
Creation date
6/3/2020 9:47:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
481
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t_1 Y <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank g ing is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equi ent is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: 0 <br /> ® Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ® Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? YE <br /> ® Yes ❑ No* Was accuracy of system product level readings tested? EN WRI <br /> ® Yes [I No* Was accuracy of system water level readings tested? T- <br /> ® Yes ❑ No* Were all probes reinstalled properly? UIZPARTME <br /> EALT <br /> IS Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> .ine Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ® Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: ®3 g.p.h.; ❑0.1 g.p.h; [10.2 g.p.h. <br /> ® Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.