Laserfiche WebLink
Vndergroua d Storage Tank System Designated CYST Operator Monthly Inspection Report — Page 2 of 2 <br />Comments: <br />S 4 a L - a w �v.r "'t-w.''�1- s:l�'G at �' ✓ awn sir <br />Required Follow -Up p ctions- <br />1. The monthly UST system inspection must be conducted by a Designated UST Operator who possesses a current "California <br />UST System Operator" exam issued by the Intonational Code Council (ICC). <br />2. The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during the monthly visual <br />inspection that may require follow-up actions. <br />3. A copy of this monthly inspection report must be provided to the UST Owner or Operator. <br />4 The UST Owner or Operator must maintain a copy of each monthly inspection report and all attachments for the most recent <br />12 coombs. The records stall be maintained on-site or, if approved by dw local agency, off-site at a readily available <br />location. <br />UN -057 - 2/2 <br />www.unidoes.org <br />9/26(05 <br />