Laserfiche WebLink
AL <br />UNDERGROUND STORAGE TANK • <br />MONITORING PLAN - PAGE 2 <br />VI. DISPENSER MONITORING <br />MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) Myo. <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT (UDC) ` f <br />1600 <br />PANEL MANUFACTURER: ! �� `� M51. MODEL #: 1 ���_ Msz. <br />LEAK SENSOR MANUFACTURER: Co !J Mss. MODEL #(S): 3fl I 5�0 Msa. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? [ff a. YES ❑ b. NO Mss. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? a a. YES ❑ b. NO M56. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? 0 a. YES ❑ b. NO M57- <br />El <br />sz❑ 2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE O EAK <br />ASSEMBLY MANUFACTURER: M58 MODEL #(S): M59. <br />❑ 3.VISUAL MONITORING DONE: ❑ Y ❑ b. WEEKLY (Acquires agency appmval) M60. <br />❑ 4. NO DISPENSERS <br />M61. <br />❑ <br />99. OTHER (Specify) <br />VII. ENHANCED LEAK DETECTION <br />❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) Mso. <br />1. THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of 7/1/2004) <br />4. ® CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ® CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. El OTHER (Specify): M81 <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br />By July 1, 2004, this facility will have a "Designated UST Operator" who has passed the operator exam administered by the International Code Council (ICC). By July <br />1, 2004, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the leak detection equipment. <br />➢ The facility employee's role with regard to spills and overfills. <br />➢ Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after July 1, 2004, the initial training will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDITIONAL INFORMATION <br />Please use this section to includany additional UST system monitoring -related information (e.g., additional information required by your.Jcal agency): <br />Mss. <br />�7rS2n.�v.�t' �Z�"_/ <br />X. PERSONNEL RESPONSIBILITIES <br />AS OF 7/l/2004, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION — <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />UST SYSTEMS IN ACCORDANCE WITH 23 CCR § 2715(b). <br />XI. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />OWNER/OPERATOR SIGNATURE REPRESENTING DATE: M9I. <br />9} owner M9o. t 1 <br />❑Operator <br />OWNEOPERATOR NAME (print): M92. OWNER/OPERATOR TITLE: M93 <br />R/ <br />(Agency Use Only) This plan has been reviewed and: �ppr-oved ❑ Approved With Conditions ❑ Disappr ved <br />Local Agency Signature: Date: <br />Comments/Special Conditions: <br />u <br />SJCEHD-d (07/03) - 3/4 ii�sivs <br />