My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:38:11 PM
Creation date
6/3/2020 9:47:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
481
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing RECEIVED ! <br /> Software Version Installed: N/A DEC l'I9 20,4 <br /> Com lets the following checklist: <br /> _-EMONMEM HUM <br /> ® Yes ❑ No* Is the audible alarm,operational? PERMIMERWrFs <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> ®Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ® Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment ( .g., modem) <br /> ❑ N/A operational? <br /> i <br /> i <br /> ® Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which s�nsors initiate <br /> positive shut-down?', (Check all that apply) ®Sump/Trench Sensors; ® Dispenser Containment ensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ® Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning de�90 <br /> �ice (i.e., no I <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audiba at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? <br /> ❑ Yes* ® No Was any monitoring',equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ® No Was liquid found inside any secondary containments stems designed as <br /> y gn dry systems. (Check all that apply) �I <br /> ❑Product; ❑ Wate'. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if applica le <br /> ® Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> i <br /> I <br /> i <br /> ! <br /> i <br /> ! <br /> I <br /> ! I <br /> 1 <br /> Monitoring Certification Test Report <br /> 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.