Laserfiche WebLink
D. Results of Testing/Servicing RECEIVED ! <br /> Software Version Installed: N/A DEC l'I9 20,4 <br /> Com lets the following checklist: <br /> _-EMONMEM HUM <br /> ® Yes ❑ No* Is the audible alarm,operational? PERMIMERWrFs <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> ®Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ® Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment ( .g., modem) <br /> ❑ N/A operational? <br /> i <br /> i <br /> ® Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which s�nsors initiate <br /> positive shut-down?', (Check all that apply) ®Sump/Trench Sensors; ® Dispenser Containment ensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ® Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning de�90 <br /> �ice (i.e., no I <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audiba at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? <br /> ❑ Yes* ® No Was any monitoring',equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ® No Was liquid found inside any secondary containments stems designed as <br /> y gn dry systems. (Check all that apply) �I <br /> ❑Product; ❑ Wate'. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if applica le <br /> ® Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> i <br /> I <br /> i <br /> ! <br /> i <br /> ! <br /> I <br /> ! I <br /> 1 <br /> Monitoring Certification Test Report <br /> 2 of 4 <br />